COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 22,1996 PSA#1536Directorate of Contracting, AGMC/PKE, Newark AFB OH 43057-0027 Z -- RECONFIGURE COOLING TOWER PIPE SOL F33659-96-Q0264 DUE 031896 POC
Carol Luckeydoo, Contract Specialist, 614-522-7421 or Contracting
Officer, Debra A. Luckeydoo, 614-522-7751. Contractor shall provide all
labor, tools, materials, administration, supervision and transportation
necessary to install a new 3'' water line from the water plant to the
chillers, boilers and cooling towers through Bldg 4 as indicated on the
drawings for the project. This project shall consist of providing and
installing 800 feet of new 3'' galvanized pipe with victaulic
couplings, pressure relief valve, air vents, pipe drains, new backflow
preventers, gate valves, water meter, hangers and sway bracing in
strict accordance with the specifications and drawings for Project NEW
960001 -- The work shall be completed within 90 calendar days after
contractor receives the Notice To Proceed -- Plans and specifications
are available for inspection without charge upon receipt of a written
request. Verbal requests will not be accepted -- RFQ F33659-96-Q0264 --
For further assistance submit requests in writing to: Carol Luckeydoo,
AGMC/PKE(3), 813 Irving-Wick Dr W, Newark AFB OH 43057-0027 or request
can be faxed to (614)522-7126 -- Issuance on or about 26 Feb 96 --
Return of Quote will be 18 Mar 96 -- Estimated cost is between $25,000
and $100,000 -- This procurement is Unrestricted based on Business
Size Standards. (0051) Loren Data Corp. http://www.ld.com (SYN# 0210 19960221\Z-0020.SOL)