COMMERCE BUSINESS DAILY ISSUE OF JANUARY 22,1996 PSA#1514U. S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT, 215 NORTH 17th STREET
OMAHA, NE 68102-4978 Y -- WASTEWATER TREATMENT PLANT UPGRADE, FOR CARSON, COLORADO SOL
DACA45-96-B-0031 DUE 031996 POC Contracting Division at: (402) 221-4266
Plans and specifications can be ordered by fax at (402) 221-4530. The
work will include the following: (Approx. quantities) New construction
will be required for the following facilities: Headworks Building
(4,600 SF), Sludge Filter Press Building (2,300 SF), Digester Control
Building (1,500 SF), Filtration/U.V. Disinfection Building (4,600 SF),
Jet Aeration Building (4,800 SF), and an addition to the existing
Control Building (1,300 SF)) All Buildings share the same exterior wall
theme of 4'', 6'', and 8'' rock-face CMU with cast-in-place concrete
spread footings and slab-on-grade construction. The Control Building
will use metal decking and open web steel joists for roof framing while
all other buildings will use precast concrete double tees. Roofing for
all buildings will be single-ply EPDM system. Interior walls on the
control Building will be gypsum board on metal studs with finish
working consisting of acoustical ceiling tile, resilient flooring, and
painting. All other buildings will have interior walls consisting of
CMU with or without epoxy coating. All buidings will require HVAC and
electrical work/lighting, communication, process piping and equipment
(i.e., blowers, compactors, grit pumps, jet motive pumps, electric
motors, controls and control panels, process storage tanks, etc.).
Various buildings will require overhead coiling doors. Additonal new
reinforced concrete structures include two final clarifiers (85'
diameter and 17' high walls); two oxidation ditches (70' x 162' joined
in the long direction by a 23' hgih common wall); and three aerobic
digesters (54' diameters and 15' high walls. Site improvements include
removal and replacement of bituminous pavement (450 tons), chain-link
fencing, and concrete pavement and sidwalks. Other removals include
trees, 8'' CMP and 20'' drain pipe. Remaining site work consists of
crushed rock surfacing, grading, landscaping, sewer and water lines,
gas piping, process piping, underground electrical distribution,
exterior lighting, signage and striping. The estimated construction
cost of this project is between $7,500,000 and $10,000,000.
Contractor's Quality Control will be a requirement in this contract.
The Contractor will be required to commence work within 10 days after
notice to proceed and complete the work 450 calendar days after receipt
of Notice to Proceed. Provisions will be included for liquidated
damages in case of failure to complete the work in the time allowed.
Performance and payment bonds will be required. Bid sets will be
available on/a February 12, 1996. Half-size plans and specifications
will be furnished upon request. All requests for solicitation packages
should be made in writing no later than 14 days prior to bid opening.
After such time, packages will be furnished if supply is available. It
has been determined that the number of sets be limited to 1 (one) per
firm (additional copies will be the responsibility of the requestor).
Please list street address (for parcel del service) and mailing
address. SPECIAL NOTES: All responders are advised that this
requirement may be cancelled or revised at any time during the
solicitation, selection, selection evaluation, negotiation and/or final
award structure and disposition of US Armed Forces. SIC NO. 1542. THIS
SOLICITATION IS UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS
PARTICIPATION. (0018) Loren Data Corp. http://www.ld.com (SYN# 0068 19960119\Y-0001.SOL)