|
COMMERCE BUSINESS DAILY ISSUE OF DECEMBER 18,1995 PSA#1492DA, Tulsa District, Corps of Engineers, POB 61, Tulsa, OK 74121-0061 Y -- MCGRATH CREEK CHANNEL IMPROVEMENT AND SPILLWAY, RED RIVER WA
TERSHED, WICHITA FALLS, TEXAS SOL DACW56-96-B-0023 DUE 021396 POC
Chief, Contracting Division, 918/669-7275. Previous CBD Notice is
corrected to read: Work consists of construction of a concrete channel
approx. 4,030 feet in length with an uncontrolled concrete spillway.
The channel generally follows the existing alignment of McGrath Creek
between Holliday Creek and Sikes Lake located within the corporate
boundaries of Wichita Falls, Texas. The work includes clearing and
grubbing, common excavation, construction of earthen berms, replacement
of reinforced concrete box culverts and bridges, construction of
headwalls, construction of concrete manholes and pipe, removal and
replacement of concrete curbing and asphalt pavement, construction of
street and surface inlets, construction of reinforced concrete U-shaped
and trapezoidal channels, installation of chain link fencing and
relocation of utilities including one sanitary sewer lift station.
Estimated cost range of this project is from $5,000,000 to $10,000,000.
An advance non-refundable fee of $30 (half-size) and $60 (full-size) is
required for each set of specifications. Make check payable to F&A
Officer, USAED, Tulsa, and mail to the attention of Contracting
Division. Payment must be received prior to issuance of plans and
specifications. No phone calls to order please. All orders will be
mailed via first class mail. Request for special handling (Federal
Express, Overnight Express, etc.) will not be honored. (0348) Loren Data Corp. http://www.ld.com (SYN# 0073 19951215\Y-0006.SOL)
Y - Construction of Structures and Facilities Index Page
|
|