COMMERCE BUSINESS DAILY ISSUE OF OCTOBER 20,1995 PSA#1456U. S. Army Corps of Engineers, Omaha District, 215 North 17th Street,
Omaha, NE 68102-4978 Y -- PAINT TURBINE UNIT #2 AND SURGE TANKS UNIT #1, GARRISON DAM NORTH
DAKOTA SOL DACW45-96-B-0010 DUE 120595 POC Contact Contracting Division
at: (402)221-4266. Work consists of removal and disposal of existing
coatings of red lead primer with top coats of vinyl, cleaning and
preparation of ferrous surfaces, and application of vinyl paint to
interior ferrous surfaces. Areas include scroll case, scroll case
extension, wicket gates, stay vanes, stay rings, runner and draft tube
liner of Power Unit #2; interior ferrous surfaces of the surge tank
risers of Power Unit #2; interior ferrous surfaces of the two surge
tanks of Power Unit #1; and interior ferrous surfaces of the surge tank
risers of Power Unit #1. The work will include the following: (Approx.
quantities) Turbine-Power Unit #2 Scroll Case and Scroll Case
Extension (Unit #2) - 7,100 ft, Draft Tube Liner (Unit #2) - 1,100 ft,
Wicket Gates (Unit #2) - 950 ft, Stay Vane and Rings (Unit #2) - 800
ft, Runner (Unit #2) - 1,700 ft, Risers-Power Unit #2 - 7,300 ft, Surge
Tanks-Power Unit #1 - 79,000 ft, Risers-Power Unit #1 - 7,300 ft. The
estimated construction cost of this project is between $500,000 and
$1,000,000. Contractor's Quality Control will be a requirement in this
contract. The Contractor will be required to commence work within 10
days after notice to proceed and complete the work on two scheduled
outages as follows: Surge Tanks and Risers Unit #1: 1 APR 1996 TO 31
MAY 1996. Tank Risers-Unit #2 and Paint Turbine Area-Unit #2: 3 SEP
1996 to 4 OCT 1996, with final cleanup and completion of work on 15 OCT
1996. Provisions will be included for liquidated damages in case of
failure to complete the work within scheduled outages and completion
date. Performance and payment bonds will be required. Bid sets will be
available on/a November 3, 1995. Half-size plans and specifications
will be furnished upon request. All requests for solicitation packages
should be made in writing no later than 14 days prior to bid opening.
After such time, packages will be furnished if supply is available. It
has been determined that the number of sets be limited to 1 (one) per
firm (additional copies will be the responsibility of the requestor).
Please list street address (for parcel del service) and mailing
address. SPECIAL NOTES: All reponders are advised that this requirement
may be cancelled or revised at any time during the solicitation,
selection, selection evaluation, negotiation and/or final award
structure and disposition of US Armed Forces. SIC NO. 1721. THIS
SOLICITATION IS UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS
PARTICIPATION. (0291) Loren Data Corp. http://www.ld.com (SYN# 0084 19951019\Y-0002.SOL)