COMMERCE BUSINESS DAILY ISSUE OF SEPTEMBER 5,1995 PSA#1424MK Ferguson Company, 7295 Highway 94 South, St. Charles, MO 63304 Y -- PRE-QUALIFICATION OF SOURCES FOR DESIGN, SUPPLY, INSTALLATION,
SUPERVISION OF STARTUP, AND TRAINING OF OPERATORS OF A MECHANICAL
CONTINUOUS THICKENER Sol RFP-3589-SC-WP462, POC Brian L. Claytor (314)
441-8086 Extension 3703. Pre-qualification of Sources, Sol RFP NO.
3589-SC-WP462. MK Ferguson Company (MK-F), is currently performing work
under a Department of Energy Prime Contract at the Weldon Spring Site
Remedial Action Project (WSSRAP) located in St. Charles, Missouri.
MK-Ferguson is requesting information from prospective Subcontractors
who are interested in being pre-qualified for bidding on a competitive
firm fixed price contract for the design, supply, installation,
supervision of startup, and training of operators of a mechanical
continuous thickener. A preliminary description of the thickener
requirements are: One mechanical continuous thickener with feed
launder, central feed well, rake mechanism, and tank with internal
overflow launder and central collection cone. Material of construction
to be carbon steel. Feed launder and rake mechanism to be supported by
bridge spanning the tank diameter. Rake mechanism to be supplied with
drive mechanism, torque measuring device, and automatic rake lift
system. Diameter of tank approximately 80 to 125 feet. Mechanism to
dewater a dilute thixotropic sludge that has been diluted to 9 percent
solids. Slurry feed rate is 700 gallons per minute. Only pre-qualified
bidders will be allowed to submit proposals. To be pre-qualified, the
submitting Subcontractor must submit, in writing, information
substantiating their ability to meet or exceed the following minimum
qualifications: 1) Must have the ability to design, manufacture, and
install thickeners which are 80 feet or greater in diameter. 2) Must
have 10 prior successful projects of this type and size. 3) Must have
10 years or more experience building equipment of this type and size.
Your substantiation of the above three points must include, at a
minimum, a list of 10 projects of this type and size which have been
completed safely. Along with the list of projects, the following must
be submitted for each of the projects referenced; a brief description
of the scope of the project, address of project, date of contract start
and completion, client name, and current contact person with phone
number. This announcement is a replacement for an announcement which
originally published Friday April 28, 1995 in Issue No. PSA-1335,
Section 39. This project is open to both large and small businesses.
The Pre-qualification Packages are due no later than September 27,
1995. It is anticipated that the proposal package for the above noted
equipment will be issued for bid between October 1995 and January 1996.
Estimated value is over $300,000. If you are interested and meet the
qualifications noted above, send your pre-qualification documents to
MK-Ferguson Company, 7295 Highway 94 South, St. Charles, Missouri
63304, Attn: Brian L. Claytor. (243) Loren Data Corp. http://www.ld.com (SYN# 0148 19950901\Y-0008.SOL)