COMMERCE BUSINESS DAILY ISSUE OF AUGUST 25,1995 PSA#1418Procurement Division, General Affairs Department, Third, Construction
Bureau, Honshu-Shikoku Bridge Authority, 1-20 Higashi-Gosho,
Onomichi-Shi 722, Japan Y -- JAPAN: S16--- CONSTRUCTION POC Tel 81/848/22-5211 FAX N/A product
data a industry Sector code: s16--- B detailed product description:
Construction Title: Construction of steel superstructure of the
umashima overpass on the kurushima Bridge; site: umashima, imabari-
Shi, ehime-ken; summary: this Project involves Construction of steel
superstructure for the umashima overpass (490.9 meters in length, 26.0
to 46.9 meters in width) and the umashima control Road (212.1 meters
in length, four meters in width) on the Onomichi-imabari route of the
Honshu- Shikoku linking highway. The umashima overpass links to the
kurushima Bridge and is made up of three-span continuous, steel surface
box-girder bridges (76.0 meters + 80.0 meters + 77.83 meters, 82.52
meters + 85.0 meters + 81.0 meters). The umashima control Road links to
the 7-a abutment of the kurushima Bridge and is made up of a two-span
continuous, steel surface box-girder Bridge and a three-span
continuous, steel surface box-girder Bridge (48.1 meters + 48.1 meters,
33.85 meters + 40.3 meters + 39.94 meters); estimated tonnage: steel
superstructure, approx. 6,950 tons; Construction period: 1,214 days;
main materials to be used: steel, approx. 6,950 tons. C product
specifications/technical data: N/a (not available) D quantity: N/a e
U.S. dollar value: N/a F other information: N/a response data a
response language: Japanese. B best way to respond: letter. C from
manufacturers only: N/a D information desired from U.S. firm: N/a e
primary buying factor: the lowest bid within the estimated price range.
F other information: pre-screening is required to be eligible for
bidding. Pre-screening deadline: 16:00 Pm, sep. 14, 1995. Bid documents
must be obtained directly from the procuring agency, not from U.S.
Embassy. Payment in yen. A issuing agency: Honshu-Shikoku Bridge
Authority B financing agency: same as above. C price of bid documents:
N/a D purchase bid documents by: 16:00 Pm, oct. 19, 1995. E Tender
number required in all communications: N/a F performance bonds
required: not required. G closed Procurement procedure: no. H bidding
procedures: open competitive Tender. I bid deadline: 14:00 Pm, nov. 2,
1995. J other information: ''kensetsu kogyo shimbun'': 8/8/95.
Eligible Tender participants must be pre-qualified firms that meet the
following criteria: 1) firms that do not fall under any of the
following categories: a) firms that have not received a permit from the
Construction minister or the prefectural governor under article 3 of
the Construction business law regarding this Project; B) firms that
have not been rehabilitated from insolvency or bankruptcy; C) firms
that have -- in the past two years, in a Contract -- deliberately
performed a poor work, or unfairly cheated on quality and quantity of
materials; interfered with fair competition, damaged fair pricing, or
colluded for unfair profit; prevented a winner from signing a Contract,
or a contractor from carrying out a Contract; prevented an official
from conducting supervision or inspection; unjustifiably reneged on a
Contract; presented false documents to this Authority; brought this
Authority other extreme losses; and employed, as representative,
Manager, or equivalent in a Contract, those who perpetrated one of the
above-described Acts within two years of their misconduct; and D)
firms whose business is judged extremely unsound; 2) consortia
comprised of firms pre-qualified for competitive bidding on steel
superstructure work by this Authority for goj fy 95/96; 3) all member
firms must score at least 1,200 points in a formula for qualification
screening for steel superstructure work; 4) all member firms must have
-- in the past, as the main contractor -- completed a similar Project
(Construction of a multi-span continuous, steel surface box- girder
Bridge of at least two lanes, 60 meters in maximum span length, and 240
meters in length); 5) firms that can assign, to the Construction site,
a field representative, chief engineer, or Engineering supervisor who
has completed a similar Project in the past as the main contractor; 6)
all member firms must not be currently suspended from designation by
the director of this Authority in areas including the ehime prefecture;
7) firms that can present an adequate plan for this Project; 8) all
member firms must not be related by capital or personnel to the
contractors involved in this Project (see Tender documents for
details); and 9) consortium must be organized as follows: a) the number
of member firms must be two or three; B) all member firms must have at
least six-tenths of the equally divided share of involvement; C) the
representative firm must have the greatest share of involvement among
all members; D) consortium must be organized by the ''ko'' method; e)
the same firm cannot belong to two or more consortia regarding this
Project; and F) a notice on organization of consortium for designated
Construction Project must be submitted as an attachment to the
application documents for pre- qualification; a letter of proxy must
also be submitted if the name of a proxy, such as a branch Manager,
etc., Appears in the submitting documents. Post remarks Post
contact/prepared by haomori approved by gtaevs Please send a copy of
your response to: Commercial Officer (FCS TOP), American Embassy,
Tokyo, Unit 45004, APO Ap 96337, Refer to TC546. Please note: All
correspondence with the Awarding Authority and/or the Procuring Agency
MUST be in Japanese.. (0235) Loren Data Corp. http://www.ld.com (SYN# 0065 19950824\Y-0001.SOL)