COMMERCE BUSINESS DAILY ISSUE OF AUGUST 3,1995 PSA#1402USPFO For North Carolina, ATTN: Contracting Office, 4201 Reedy Creek
Road, Raleigh, NC 27607-6412 Y -- CONSTRUCTION OF OFFICE TYPE FACILITY AND AIRCRAFT RAMP EXPANSION,
NORTH CAROLINA AIR NATIONAL GUARD, CHARLOTTE, NC Sol. DAHA31-95-B-0004.
Contact, MSG Ralph L. Young, Contract Specialist, 919/664-6019 or Mrs.
Edith S. Dozier, 919/664-6040. Construction of ``Composite Deployment
Support Facility,'' for the North Carolina Air National Guard (NCANG),
Albemarle-Stanly County Airport, 40659 Airport Road, New London, NC
28127. The project consists of construction of a 9,000 square foot
office and 12,750 square yards of aircraft ramp expansion. The facility
will be mostly general purpose office areas with a classroom complete
with audio and visual equipment hookups, two separate offices
constructed for security conferences, a second story observation and
control area with 360 degree visual observation of approaching air
traffic and general purpose areas including rest rooms and break area.
The facility will also include a large warehouse area with exposed
structural members and finished concrete flooring, a three bay fire
department with adjacent office and bunker gear storage areas. The
floow in the fire department will drain through an oil/water separator.
All areas will have typical flooring and finished standard for the use
with suspended ceiling in most areas and flourescent lighting. The
ramp expansion includes approximately 95,700 cubic yards of borrow and
earthwork, 4,300 square yards of concrete pavement and approximately
14,600 square yards of bituminous pavement. The project includes
underground electical, water, sewer, and telecommunications utilities.
The principle features include site work 34%, Paving 24%, Metals 4%,
Carpentry 11%, Plumbing 4%, HVAC 5%, and Electrical 6%. At the option
of the NCANG, and as funding permits, the following Additive Bid Items
(ABI's) will be included in the scope of the contract: ABI #1, Deletg
all asphalt aircraft pavement and add rigid concrete pavement in place
of asphalt pavement; ABI #2, All all grading, drainage, erosion
control, paving, marking, and seeding associated with the entrance road
to the east side of the site; ABI #3, Add all landscaping except for
seeding of grass; and ABI #4, Add architectural casework. The
completion time for this project is 300 calendar days. Official written
request for information should refer to IFB: DAHA31-95-B-0004,
``Construct Composite Deployment Support Facility'', PN: 0000949523.
Bid opening is tentatively scheduled on/about September 19, 1995.
Invitations for bid will be issued to potential prime contractors (not
suppliers or subcontractors) in one copy only on first-received, first
served basis until supply is exhausted. Telephone request will not be
honored. Plans may be reviewed at AGC or F.W. Dodge offices in
Raleight, Charlotte and Greensboro, NC., Bid deposit of $125.00 in the
form of a certified check or cashiers check or money order made
payable to the ``Finance and Accounting Officer, Shaw AFB'' is
required. Deposit will be refunded provided the drawings,
specifications, and bidding documents are returned, transportation
prepaid, in good condition, without marks, notes, or mutilations to the
issuing office within 33 calendar days after bid opening. Industrial
Classification (SIC) is 1542. This procurement is offered on an
unrestricted basis. The successful contractor will perform a minimum of
20% of cost of the contract with its own employees not including the
cost of materials, Ref FAR Clause 52.236-1, Performance of Work by the
Contractor. In accordance with FAR 36.204, magnitude of cost: between
$1,000,000 to $5,000,000. (212) Loren Data Corp. http://www.ld.com (SYN# 0161 19950802\Y-0003.SOL)