Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JULY 28,1995 PSA#1398

NORTHERN DIVISION, NAVAL FACILITIES ENGINEERING COMMAND, 10 INDUSTRIAL HIGHWAY, MAIL STOP #82, LESTER, PA 19113-2090

C -- ENGINEERING AND DESIGN SERVICES FOR VARIOUS PROJECTS IN THE STATES OF DE, PA, NY, NJ, MA, CT, RI, NH, ME, AND VT. SOL N62472-95-D-1400 DUE 082995 POC Contact Point, ANTHONY TETI, (610)-595-0643 Engineering and design services for an indefinite quantity contract for the preparation of engineering studies, plans, specifications, and cost estimates for various multidiscipline projects in the states of PA, NY, NJ,MA, CT, RI, NH, VT, ME, and DE. However, the projects will primarily be in PA, DE, NY, and NJ. The work includes but is not limited to: project development, electronic deliverables(in accordance with Northern Division's CADD policy), specs(using the Specsintact system), and cost estimates(the NAVFAC CES program) for new facilities andupgrades of existing facilities. Contract options will be exercised at the discretion of the government for post construction contract award services including shop drawing review/approval, consultation during construction, construction inspection services, and preparation of record drawings. The initial project is the consolidation of Naval activities at the U.S. Naval Base, Philadelphia, PA. The purpose of this project is for downsizing to meet future needs including: 1) electrical distribution system, transformers, installation of new feeders, and power for fire alarm systems; 2) construction of a sewage pumping station; 3) installation of storm sewer lines, manholes, and pumping station; 4) potable water system piping modifications; 5) installation of backup fire pump; 6) capping of steam lines; and 7) removal of associated asbestos insulation. The following pre- priced options may be exercised at the discretion of the government: assessment studies, 0-35%, 35-100% design, and Post Construction Contract Award Services such as shop drawing preparation of record drawings. Options are normally exercised within several months of completing prior work, however, delays of up to one year are possible. As part of this contract, an asbestos assessment may be required to determine the presence of asbestos material during removals/demolition or at utility points of connections. Significant Evaluation Factors (In Order of Importance) for the initial project and others: 1. Multi-discipline experience (including structural and architectural design) of the firm in the assessment, technical evaluation, and design of utilities such as electrical systems, fire protection, sanitary and storm sewer systems, potable water systems, pumping stations, and steam distribution and re-routing. 2. Professional qualifications of staff to be assigned to this contract (including those of any consultants). 3. Capacity of the assigned team to accomplish the work within the required time constraints. 4. Past performance with respect to construction cost control, quality of work, and compliance with performance schedules (emphasis on D.O.D. work). 5. Location of the firm in the general geographical area of the project and knowledge of the locality of the project, provided that there is an appropriate number of qualified firms therein for consideration. 6. List the small or disadvantaged or women-owned business firms used as primary consultants or as subconsultants. 7. Volume of work previously awarded to the firm by the Department of Defense. Estimated Construction Cost: $10,000,000-$15,000,000. Type of Contract: Firm-Fixed Price. Estimated Start Date: February 1996. Estimated Completion Date: February 1998. A/E firms which meet the requirements described in this announcement are invited to submit completed Standard Forms 254 and 255 to the office shown above. Firms responding to this announcement by 29 August 1995 will be considered. Respondents may supplement this proposal with graphic material and photographs which best demonstrate capabilities of the team proposed by the project. No material will be returned. This is not a request for proposal. The contract minimum will be the award of the initial project. THERE WILL BE NO DOLLAR LIMIT PER PROJECT. THE TOTAL FEE (BASE YEAR PLUS THE OPTION) THAT MAY BE PAID UNDER THIS CONTRACT WILL NOT EXCEED $5,000,000. THE DURATION OF THIS CONTRACT WILL BE FOR ONE YEAR WITH AN OPTION FOR AN ADDITIONAL YEAR. THE TOTAL OPTION FEE WILL BE LIMITED TO $5,000,000 MINUS THE BASE YEAR MINIMUM. IN NO CASE WILL THE BASE YEAR PLUS THE OPTION FEES COMBINED EXCEED $5,000,000. THIS OPTION MAY BE EXERCISED AT THE DISCRETION OF THE GOVERNMENT SUBJECT TO WORKLOAD AND/OR SATISFACTION OF A/E PERFORMANCE UNDER THE SUBJECT CONTRACT. (0207)

Loren Data Corp. http://www.ld.com (SYN# 0015 19950727\C-0003.SOL)


C - Architect and Engineering Services - Construction Index Page