COMMERCE BUSINESS DAILY ISSUE OF JULY 27,1995 PSA#1397U. S. Army Engineer District, Savannah, P.O. Box 889, Savannah, Georgia
31402-0889 Y -- LAKE LINDSAY & MCFAYDEN POND IMPROVEMENTS AND REPAIR WATER
CONTROL STRUCTURES - FORT BRAGG, NC SOL DACA21-95-B-0102 DUE 091395 POC
Contractual Questions - Linda Elliott, 912/652-5076 Technical Questions
- Capt. Rafael Gavilon, 912/652-5618. Description of Work: (1) BASE BID
- Repair Water Control Structure, Lake Lindsay: The Contractor shall
furnish all labor, equipment, materials, and transportation, and
perform all work necessary to demolish the existing outlet structure,
construct a new structure, piping, stilling basin and rip rap emergency
spillway, construct dam to sections shown on the plans, install
permanent piezometers, grade and seed site, construct boat ramp and
pier, and construct gravel roads in strict compliance with technical
provisions and all other terms. (292,000; 270 days) (2) OPTION NO. 1 -
Remove Sedimentation, McFayden Pond: The Contractor shall furnish all
labor, equipment, materials, and transportation, and perform all work
necessary to repair concrete outlet structure, concrete channel and
spillway, remove all sediment in the lake and upstream sediment basins,
and erosion control measures. Some sediment contains petroleum
products. (807,100; 360 days) (3) OPTION NO. 2 - Repair Water Control
Structure, Lake Hurley: The Contractor shall furnish all labor,
equipment, materials, and transportation, and perform all work
necessary to demolish the existing outlet structure, construct a new
intake structure and piping, construct dam to sections shown on the
plans, install permanent piezometers, grade and seed the site,
construct boat ramp, and construct toe drain as shown, in strict
compliance with the technical provisions and all other terms. (163,000;
270 days) (4) OPTION NO. 3 - Repair Water Control Structure, Lake
Hutaff: The Contractor shall furnish all labor, equipment, materials,
and transportation, and perform all work necessary to demolish the
existing outlet structure, construct a new intake structure and piping,
construct dam to sections shown on the plans, install permanent
piezometers, grade and seed the site, construct boat ramp, and remove
sediment as shown, in strict compliance with the technical provisions
and all other terms. (406,000; 270 days). Network Analysis System will
not be required. Estimated cost range of project is from $1,000,000 to
$5,000,000. Cost of solicitation documents is $25. Make check payable
to F&A Officer. Solicitation documents will be available August 14,
1995 (approx.). In order to receive documents in a timely manner,
requests should be received by August 4, 1995. This solicitation is
issued on an unrestricted basis pursuant to the ''Business Opportunity
Development Reform Act of 1988'' (Public Law 100-656). Only written
requests for plans and specifications will be accepted. Please state
area code, telephone number, street address and nine digit zip code.
Plans and specifications are available Mon. thru Fri. 8:30 AM to 5 PM,
100 W. Oglethorpe Ave., Savannah, GA 31401-3640. (0206) Loren Data Corp. http://www.ld.com (SYN# 0126 19950726\Y-0003.SOL)