|
COMMERCE BUSINESS DAILY ISSUE OF JULY 26,1995 PSA#1396USPFO for Washington, ATTN: Contracting Office, Bldg 32, Camp Murray,
Tacoma, WA 98430-5170 Z -- REPAIR HANGAR DOOR TRACKS, FAIRCHILD AFB, WASHINGTON AIR NATIONAL
GUARD STATION SOL DAHA45-95-B-0013 DUE 090795 POC Contracting Office,
Joanie Dobesh, 206/512-8311; Project Officer, LtCol Daniel Hirst,
509/247-7352 Furnish all plant, labor, equipment, materials, tools and
other items required to replace existing snow melting system; replace
hangar door rails and wheels; and all requirements to replace the
hangar door tracks. Time of completion is 60 days from receipt of the
Notice to Proceed. Solicitations will be available on or about 9 August
1995 on a first come, first serve basis by written or faxed requests
only. FAX number, 206-512-8933. The ECC is between $100,000 and
$500,000. The proposed construction is a 100 percent set-aside for
small disadvantaged business concerns (SDB). Requests for solicitations
from prime contractors will not be honored if they do not certify that
they are an SDB. See Note 4. (0205) Loren Data Corp. http://www.ld.com (SYN# 0280 19950725\Z-0085.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|