|
COMMERCE BUSINESS DAILY ISSUE OF JULY 26,1995 PSA#1396Westinghouse Electric Corporation, Bettis Lab., P.O. Box 79, 814
Pittsburgh-McKeesport Boulevard, West Mifflin, PA 151220079 66 -- MODIFICATION OF CRANE Sol. 73-RCC-894113. Contact Roslyn
Castagna, 412/476-6139. This modification includes the labor,
materials, equipment, tools, and services necessary for the
procurement, design, fabrication, shipping, installation, and test
inspection of a new 10 ton hoist and trolley, a new radio control
system, complete bridge mechanical drive system, complete trolley and
bridge electrification system, trolley bumpers and stops, and footwalk
and bridge rails. The existing Conco crane has been completely removed
with the exception of the bridge girders and end trucks. The contract
supplier would be responsible for providing and installing of all
required mechanical and electronic parts needed to support the
operation of the crane system. 1. All prospective bidder personnel
should have U.S. Department of Energy (DOE) security clearances to
attend the on-site pre-bid tour. Uncleared personnel will be escorted
to tour areas where work will be performed, except those areas
determined to be sensitive by Westinghouse. Attendance at such feelings
is essential for proper understanding of unique ingress/egress
procedure and complex site conditions. Also, all personnel who will be
performing on-site work requires a DOE security clearance. It takes
approximately two to three months to obtain a security clearance after
an individual submits a completed and acceptance ``Questionnaire for
Sensitive Position'' (QSP). In this regard, in order for your company
to receive a copy of the RFQ package, completed QSPs must be submitted
to Westinghouse within two weeks from the date of your request for a
copy of the RFQ package. Westinghouse shall process clearances at no
cost to the contractor; however, the effort to complete and submit QSPs
is solely at the contractor's expense. 2. Prospective bidders must
agree to submit a current Foreign Ownership, Control or Influence
Certification and all necessary supporting business and financial
documentation, if requested by Westinghouse. Request for the RFQ along
with the necessary documentation clearly showing your firm meets the
above minimum prerequisites, must be in writing (telephone requests
will not be honored), and your letter must be postmarked no later than
than fifteen calendar days after the date of this CBD publication. The
contract for the above detailed workscope will be firm fixed-price.
(205) Loren Data Corp. http://www.ld.com (SYN# 0474 19950725\66-0002.SOL)
66 - Instruments and Laboratory Equipment Index Page
|
|