COMMERCE BUSINESS DAILY ISSUE OF JULY 19,1995 PSA#1391USDA Forest Service, Mt. Hood National Forest, 2955 NW Division Street,
Gresham, OR 97030 Y -- COE AND ELIOT BRIDGE REPLACEMENT SOL SOL R6-6-95-683 DUE 083095
POC Contracting Section, 503/666-0621 This project consists of
replacing two bridges on Forest Service Road 2840. These sites require
the removal of the existing wood stringers and decking with the
replacement being a permanent reinforced concrete span. COE bridge
additionally requires the removal of the timber crib substructure and
reconstruction with permanent footings and abutments. Installation and
removal of two prefabricated bridges is required to provide
undisturbed traffic flow. The Government's Estimate is between S100,000
and S250,000. See Numbered Notes 1 and 3. (0198) Loren Data Corp. http://www.ld.com (SYN# 0235 19950718\Y-0070.SOL)