COMMERCE BUSINESS DAILY ISSUE OF JULY 13,1995 PSA#1387USDA Forest Service, 2222 West 2300 South, Salt Lake City, UT 84119 Y -- PINE VALLEY/SHINGLE CREEK WATER SYSTEM. PROJECT ON THE
WASATCH-CACHE NATIONAL FOREST. SOL IFB 19-95-024 DUE 090895 Contact
Nelda Montgomery, 801/975-3443/ Contracting Officer Kane Goodsell,
801/975-3442. This project consists of installation of 1.5 HP
submersible pump, 6000 gallon storage tank, and concrete pumphouse.
Installation of 10,100 feet of 3 inch waterline and 6100 feet to 15,000
volt primary electrical power. 5100 feet of the electrical line will be
installed in the same trench as the 3 inch waterline. Electrical power
installation will include pump controls and all costs to bring power
to he pumphouse. Contractor will pay all costs of electrical
installation to electrical utility company. Pine Valley/Shingle Creek
Water System is located approximately 8 miles east of Kamas, Utah on
the west side of State Highway 150. Project is between Shingle Creek
Campground and Pine Valley Campground. Solicitation will be issued
approximately 8/09/95. This proposed procurement is between $100,000
and $249,000. Plans will be available at a $15 non-refundable charge on
a first come first served basis. Solicitation may be ordered in writing
to the above address. (191) Loren Data Corp. http://www.ld.com (SYN# 0182 19950712\Y-0037.SOL)