COMMERCE BUSINESS DAILY ISSUE OF JULY 13,1995 PSA#1387DVA Medical Center, 3200 Vine Street, Cincinnati, OH 45220 R -- DESIGN DEVELOPMENT FOR FIRE SAFETY SYSTEM SOL 539-70-95 DUE
081495 POC Contact Point, Wanda Perdomo, (513)559-5062, Contracting
Officer, Mary M. Boyd, (513)559-5619, Additional Contact, Judy
Blasingame, (513)559-5036 Provide Architectural-Engineering Services
for design development and construction documents for a project to
install a sprinkler system and replace the fire alarm system at the VA
Medical Center, Cincinnati, Ohio. The work may involve design,
drafting, planning, studies, site investigation, and construction phase
services associated with this type of project. The proposed services
will be procured by a negotiated fixed-price contract. Estimated design
start date is October 1995. The estimated cost of construction is
between $1,000,000 and $5,000,000. Interested firms are invited to
submit a completed Standard Form 254 and Standard Form 255 to this
office by 4:30 P.M., August 14, 1995. Only firms within a 150 mile
radius of Cincinnati, Ohio will be considered. Those firms having the
capability to provide the services shall address the following
evaluation criteria: (I) Team proposed for this project: Background of
the personnel (1. Project manager, 2. Other key personnel, 3.
Consultants); (II) Proposed management plan: Team organization (1.
Design phase, 2. Construction phase); (III) Previous experience of team
proposed for this project: Describe projects; (IV) Location and
facilities of working offices: A. Prime firm, B. Consultants; (V)
Present proposed design approach for this project: A. Describe proposed
design philosophy. B. What problems do you anticipate and how do you
propose to solve them? C. Describe possible energy applications. D.
Describe innovative approaches in production and design.; (VI) Cost
Control: A. What control techniques are planned? B. Who will be
responsible for cost control? C. Review recent projects to demonstrate
ability to meet project cost target, and any additional construction
costs caused by design deficiences.; (VII) Estimating effectiveness:
Review ten most recently bid projects to demonstrate estimating
effectiveness; (VIII) Schedule Control: A. What techniques are planned
to assure that schedule will be met? B. Who will be responsible to
assure that schedule will be met? C. Review recent projects to
demonstrate ability to meet project schedules.; (IX) Describe your
experience and capabilities in the following areas: A. Specialized
experience for this project, B. Computer aided design and drafting, C.
Other computer applications; (X) Miscellaneous: A. Describe awards
received for design excellence. B. Describe circumstance and outcome of
any litigation you have been involved in over the past five years. C.
Indicate type and amount of liability insurance you carry. This is not
a Request For Proposal. The Standard Industrial Code is 8712, with an
average annual sales or receipts for the preceding three fiscal years
not to exceed $2.5 million. See Note 24. (0192) Loren Data Corp. http://www.ld.com (SYN# 0091 19950712\R-0001.SOL)