COMMERCE BUSINESS DAILY ISSUE OF JULY 12,1995 PSA#1386U.S. Army Garrison Fort Ritchie, Directorate of Contracting, ATTN:
ANRT-OCA, 601 Lakeside Drive, Fort Ritchie, MD 21719-3205 Z -- UPGRADE HVAC, D&E BLDGS, AJCC, FORT RITCHIE, MD SOL
DAHC38-95-B-0007 DUE 092295 POC Donna Blackstone, Contract Specialist,
(717) 878-5370; Richard C. Dutrow, Contracting Officer, (717)
878-4261. NOTE 1: In order to obtain a copy of this solicitation,
requestor must provide a non-refundable fee in the form of MONEY ORDER,
CERTIFIED CHECK, OR CASHIER'S CHECK, made PAYABLE TO: U. S. TREASURER
in the amount of $100.00. NOTE II: Contractor personnel must have or be
able to obtain a Secret Security Classification. NOTE III: Funds are
not presently available for this project. Work consists of furnishing
all labor, materials, equipment, tools, accessories, supervision,
protection, services as required to upgrade HVAC systems in D&E Bldgs
in the AJCC facility located in Pennsylvania but supported by Fort
Ritchie, MD.General work includes, but is not limited to: Removal of
existing ceilings in corridors and spaces services by ACUs and replaced
with new acoustic panel ceiling; Disposal of existing equipment and
materials to be replaced; Removal of existing and provide new support
for the new roof top mechanical unit; Removal of asbestos material
encountered that is associated with the HVAC system upgrade; Patching
and repairing any areas damaged due to construction process. Mechanical
work includes, but is not limited to: Removal of existing ACUs and
associated ductwork, insulation, and chilled water piping; Remove
existing supply diffusers and return registers within the existing air
distribution systems; Install new ACUs and associated ductwork,
insulation, and chilled water piping; Install new supply diffusers and
return registers within the new air distribution systems. Electrical
work includes, but is not limited to: Disconnect/ reconnect power and
EMCS devies; Install electro-pneumatic transducers; Removal/replacement
of light fixtures; Extension/reinstallation of ceiling mounted devices.
Estimated amount of this project is between $1,000,000 and $5,000,000.
Contract duration is maximum 1,000 calendar days. Requests for this
project must be in writing, contain the $100.00 fee, and must state
that the vendor is not currently on the Consolidated List of Debarred,
Suspended and Ineligible Contractors List or are otherwise ineligible
to receive Government contacts. Telephonic requests shall not be
accepted (0191) Loren Data Corp. http://www.ld.com (SYN# 0261 19950711\Z-0006.SOL)