|
COMMERCE BUSINESS DAILY ISSUE OF JULY 11,1995 PSA#1385Officer in Charge NAVFAC Contracts, Navy Shipps Parts Control Center,
Building 305, Code 08C, P. O. Box 2020, Mechanicsburg, PA 17055-0788 Y -- CHILLER REPLACEMENT, BUILDING 410, NAVY SHIPS PARTS CONTROL
CENTER, MECHANICSBURG, PA Sol N62472-94-B-6067 Due 082495 POC For Plans
and Specs: D. R. Small (717) 790-2515, fax (717) 790-2529/Contracting
Officer, J. M. Nihoff. The proposed contract listed here is being
considered for 100 percent set-aside for small disadvantaged business
(SDB) concerns. Interested SDB concerns that meet this criteria who
wish to be considered in accordance with Public Law and Federal
Acquisition Regulations should, as early as possible but not later than
15 days of this notice, indicate interest in the acquisition by
providing to the Contracting Office evidence of capability to perform
(including references for similar work with points of contact,
telephone number and contract number), letter from bonding company
certifying maximum level of bonding for the proposed project,
affirmative statement requesting set-aside action and intent to bid,
and a positive statement of eligibility as a small socially and
economically disadvantaged business concern. Even if you have sent
evidence of SDB eligibility on a prior solicitation, you must submit
documentation that will become a part of this solicitation file. If
adequate interest is not received from SDB concerns, within fifteen
days of this notice, the solicitation will be issued as unrestricted
without further notice. Funds are not presently available for this
contract. The Government's obligation under this contract is contingent
upon the availability of appropriated funds from which payment for
contract purposes can be made. No legal liability on the part of the
Government for any payment may arise until funds are made available to
the Contracting Officer for this contract and until the Contractor
receives notice of such availability, to be confirmed in writing by the
Contracting Officer. The work includes furnishing all labor, material
and equipment as required for replacing the existing R-11 Centrufugal
200 Ton Chiller with a new R-123 Centrufugal Chiller of approximately
the same size. Rebuild the existing condenser and chilled water pumps:
Remove portion of the existing exterior wall to remove existing
chiller and install new; Repair wall opening and any incidental related
work. Estimated price range: Between $100,000 snf $250,000. Number of
days in contract: 180. Number of bid items: One. Standard Industrial
Classification: 1711 Plumbing, Heating, and Air Conditioning $7.0
Million. (186) Loren Data Corp. http://www.ld.com (SYN# 0212 19950710\Y-0009.SOL)
Y - Construction of Structures and Facilities Index Page
|
|