COMMERCE BUSINESS DAILY ISSUE OF JULY 5,1995 PSA#1381Department of the Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- ASBESTOS REMOVAL, BARRE FALLS DAM/BIRCH HILL DAM, HUBBARDSTON AND
ATHOL, MASSACHUSETTS SOL DACW33-95-B-0079 DUE 090695 POC Jerry
Nunziato, 617-647-8424 The work of this project consists of removing 30
LF of 3/4-inch diameter and 142 LF of 2-inch diameter abandoned
asbestos insulated steel pipe, removing about 40 CY of asbestos
contaminated batt and blown-in insulation, disposing of various
asbestos contaminated storage items, and decontaminating various
asbestos contaminated storage items from attic spaces. The work also
involves providing and installing 2,015 SF of new 6-inch thick
fiberglass batt insulation in attic spaces. The proposed contract
listed here is a 100% small business set-aside. Estimated cost of the
work is between $25,000.00 and $100,000.00. Work shall be completed
within 180 calendar days. Plans and specifications available on or
about 080195 at a cost of $15.00 per set. All responsible sources may
submit a bid which will be considered by the New England Division.
(0181) Loren Data Corp. http://www.ld.com (SYN# 0371 19950703\Z-0123.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|