COMMERCE BUSINESS DAILY ISSUE OF JUNE 30,1995 PSA#1379440th Airlift Wing/General Mitchell International Airport, 300 East
College Avenue, Milwaukee, WI 53207-6299 Z -- PRE-SOLICITATION REPAIR/UPGRADE/MAINTAIN BASE SUPPLY FACILITY POC
Lois L Hess, (414)482-5273. PRE-SOLICITATION NOTICE -
Repair/Upgrade/Maintain Base Supply Facility, HTUX 93-0005 A/B/C at the
440th Airlift Wing/General Mitchell International Airport, 300 East
College Avenue, Milwaukee, WI 53207-6299. This project will have three
separate line items and will be awarded on the total aggregate bid of
those three line items. Project Repair Base Supply Facility, HTUX
93-0005A consists of the demolition and replacement of all fixtures,
paneling, flooring, and cabinets in all toilets; re-surfacing warehouse
floors with non-skid urethane surface material; removal and replacement
of floor tile in existing corridors; providing carpeting and ceiling
tiles in offices and classrooms; a comprehensive replacement of
warehouse lighting; and the installation of window treatments.
Statutory limitations are not applicable to this project. Project
Upgrade Base Supply Facility, HTUX 93-0005B consists of the
construction of a new breakroom; the construction of a 150 LF by 25 FT
high partition wall; the relocation of the customer service area;
extending the existing sprinkler line branches; installing additional
electrical and communications outlets; installing vinyl wall covering
and minimal re-work of the HVAC controls and ductwork. This project is
subject to statutory limitations of $300,000. Project Maintain Base
Supply Facility, HTUX 93-0005C consists of the preparation and painting
of the open warehouse areas, office and passageways within the Base
Supply Facility. The open warehouse areas include the interior steel
supporting structure, exposed pipes, electrical conduit and exclosures;
stairwells, doors, handrails, interior walls and ceilings, striping,
markings and pipe labels. This project is not subject to statutory
limitations. Construction magnitude for the three projects is $250,000
- $500,000. Performance time will be 150 calendar days after Notice to
Proceed for the accomplishment of all three projects as one effort.
Solicitation will be issued on or about 10 Aug 95. This acquisition is
being considered for Small Disadvantaged Business (SDB) Set-Aside.
Interested SDB firms should as early as possible but no later than 15
days of this notice, notify this office IN WRITING of their intention
to bid the project as a prime contractor. This notification MUST
include a positive statement of eligibility as a small socially and
economically disadvantaged business concern, evidence of capacity to
obtain required bonds and specific information which demonstrates the
capability to perform a project of this complexity and magnitude.
Complete information concerning management experience in similar work
and financial status should be submitted with references. If adequate
interest is not received from SDB concerns, the solicitation will be
issued as UNRESTRICTED without further notice. Therefore, replies are
requested from ALL interested business concerns. Bid packages will be
available to PRIME contractors only a first come first serve basis and
must be in writing. (174) Loren Data Corp. http://www.ld.com (SYN# 0223 19950629\Z-0001.SOL)