COMMERCE BUSINESS DAILY ISSUE OF JUNE 27,1995 PSA#1376

Officer in Charge of Construction, NAVFACENGCOM Contracts, Marianas, PSC 455, Box 175, FPO AP 96540-2200 (Code 021)

C -- SPECIAL PROJECT R1-94, EARTHQUAKE DAMAGE REPAIRS TO WHARF ''SIERRA'', U.S. NAVAL ACTIVITIES, GUAM, M.I. SOL N62766-95-C-0007 POC Contact Salve M. Sabido, Contract Specialist, 671/333- 2925/2926 Firm Fixed-Price Architect-Engineer Services for the preparation of Plans, Specifications and Cost Estimates suitable for Bidding and Construction. The Earthquake (Registering 8.1 on the Richter Scale) which occurred on 08 August 1993 caused a significant structural damage to various buildings and structures on Guam including Wharf ''Sierra''. Earthquake damages to Wharf ''Sierra'' include pavement/subgrade settlement and cracks on the dockside paved area, bent/broken steel sheet piles, cracks and spalls on the concrete bulkhead, and possibly ruptures/cracks on the utility lines. To restore the structural integrity of the dockside area and to ensure continuous and reliable operations in the wharf. This project proposes to repair the wharf. Repairs consist of stabilizing the subgrade material, resurfacing the dockside paved area, replacing damaged steel sheet piles by driving new piles, replacing fendering system and concrete bulkhead, repairing damaged utility lines, cathodic protection, and other associated work required.Selection will be based on the following criteria which arenumbered in order of importance: (1) Recent specialized experience of the firm and proposed consultants in the design of repairs to wharves. List experience with similar projects successfully designed in the last five years; (2) Professional qualifications of the staff (in-house and/or consultants(s)), with respect to the overall makeup of the design. The experience and roles of key design personnel, specifically on related projects addressed in criteria element one; (3) Design Quality Control Program. Provide information describing the quality control program and key procedures including coordination of subcontractors, quality control program. Include documentation that demonstrates successful application of quality control program for previous projects similar to those listed in criteria (2) above; (4) Capacity to accomplish the work in the required time; (5) Past performance on contracts of similar nature to that identified in the ''Description'' above with government agencies and private industries in terms of compliance with the performance schedules and cost control. Show examples of bid prices compared to A-E cost estimates for similar recent projects. Also, show cost control measures taken and office procedures used to ensure design within authorized project parameter. List recent award commendations and other performance evaluations; (6) Location. Demonstrate knowledge of conditions and requirements for design and construction in the locality. Discuss location of the firm in general geographical area; (7) Volume of DoD award. Indicate volume of work previously awarded by the Department of Defense (DoD) to the firm in the last 12 months; (8) Use of Small or Small Disadvantaged or Women-Owned businesses as subcontractors. The estimated construction cost range is between $5,000,000.00 and $10,000,000.00. A-E firms which meet the requirements described in this announcement are invited to submit complete, updated Standard Form 254 and 255 to the office shown above. Only one copy of each form is required. IN BLOCK 10 AND AN ADDENDUM THERETO IF NECESSARY, STATE WHY OUR FIRM IS SPECIALLY QUALIFIED BASED ON EACH OF THE ABOVE SELECTION CRITERIA. FOR SELECTION EVALUATION CRITERIA (1), PROVIDE THE FOLLOWING INFORMATION FOR ONLY THE STAFF PROPOSED FOR THIS WORK USING THESE COLUMN HEADINGS: ''NAME'', ''RELATED PROJS WORKED ON'', ''YEAR'', ''FIRM'', AND ''TECHNICAL ROLE''. Show the office location where work will be done and describe the experience and location of those that will do the work. Firms responding to this announcement within 30 days from publication date will be considered. Firms must submit forms to the Contracts Department by 2:00 p.m., Guam Time on the closing date. Should the due date fall on a weekend or holiday, Standard Form 254 and 255 will be due the first workday thereafter. This is NOT a request for proposal. SIC Code 8711. See Note 24. (0174)

Loren Data Corp. http://www.ld.com (SYN# 0019 19950626\C-0004.SOL)


C - Architect and Engineering Services - Construction Index Page