COMMERCE BUSINESS DAILY ISSUE OF june 19,1995 PSA#137023 CONS/LGCC, 1443 Reilly Rd., Ste. C., Pope Air Force Base, NC
28308-2896 Z -- ALTERATIONS AND REPAIRS TO VEHICLE MAINTENANCE BUILDING, 766,
POPE AIR FORCE BASE, NC 28308-2896 SOL F31601-95-B0023. DUE 080795.
Contact Mary Marion, Contract Specialist, 910-394-6279 - Contracting
Officer, John Howard, 910-394-6278. The project consists of furnishing
plant, material, labor, equipment, supplies and performing all
operations relative to the Alteration and Repair to the Vehicle
Maintenance Building 766, Project No. TMKH 94-1016A/B in strict
accordance with specifications and drawings and subject to the terms
and conditions of the contract. The project consists of upgrading
Building 766 to include heating, air conditioning, and electrical
systems. Install new split-face CMU veneer on the walls of the
building. Remove the front canopy. Latrine facilities shall be upgraded
with a shower constructed in the women's latrine. Demolish the existing
29' x 10' rear addition (Mech. Rm. and Records/Storage Room). Construct
a new 35' x 10' rear addition to house the Mech. Rm. and
Records/Storage Rm. Enclose three (3) overhead doors and install one
(1) personnel door and window in the Office Area. Replace all doors and
windows throughout the facility. A fire-rated door shall be installed
between Roosm #100 and #102. Construct an interior ``wire'' storage
enclosure within the Warehouse Room #100. All interior walls of Rooms
#101 through #107 are to be furred out and covered with gypsum board.
Install a new pitched standing seam roof and associated framing over
the existing roof. Remove the existing underground tank and guard
railing. The work includes concrete, architectural profile CMU veneer
walls, standing seam metal roof and roof framing, masonry ``fill-in''
walls, metal studs/furring with gypsum board, 2' x 2' accoustical tile
ceilings (gypsum board ceilings where indicated), waterproofing, solid
core wood doors, HM doors and frames, aluminum windows, hardware,
glazing, and interior finishes. Replace existing lighting and relocate
existing outlets, switches, and telephone jacks to accommodate the new
walls and finishes. Upgrade the plumbing, fire protection,
heating-ventilating-air conditioning upgrade for Rooms #101 through
#107. Install new ceiling fans in Room #100. Magnitude of the project
is between $250,000 and $500,000. The contract performance period for
this project is 105 calendar days after Notice to Proceed. This
proposed acquisition is being considered for 100% set-aside for small
disadvantaged business (SDB). Interested SDB firms need to submit their
interest no later than 3 Jul 95 and provide evidence of eligibility. If
adequate interest is not received from SDB firms, the solicitation will
be issued unrestricted; therefore, replies are requested from all
business concerns. SDB eligibility evidence to include performance
references, previous similar projects completed, and positive statement
of eligibility evidence to include performance references, previous
similar projects completed. All responsible sources may submit a
bid/proposal which shall be considered by the Agency. Only wirtten
requests for the Invitation for Bid packages will be acknowledged.
(165) Loren Data Corp. http://www.ld.com (SYN# 0148 19950616\Z-0002.SOL)