354th CONS/LGC 3112 BROADWAY AVE UNIT 5B EIELSON AFB AK 99702-1887

Z -- Z - REPAIR UTILIDOR, PHASE I & II SOL F65503-95-B0031 DUE 080395 POC Ariel Amposta, Contract Administrator, (907) 377-3971. Repair Utilidor Phase II will be incorporated as part of this IFB. Work shall include the following: Complete asbestos abatement, construction of barrier walls in utilidors, excavation of utilidors, removal, stockpiling, screening, sampling, and testing of hydrocarbon contaminated soils in project site shall be included. Asphalt, gravel, and turf areas shall be repaired after excavation. Replacement of all condensate piping within the project limits to include valves, expansion joints, pipe alignment guides, and steam traps on all drip legs. Expansion joints on all of the steam lines shall be replaced to include new guides. Some anchors shall be installed and other repaired. The specifications for Phase II will be available on or about 05 Jul 95. Performance period shall be 120 calendar days for each phase. The magnitude is between $1,000,000 and $5,000,000. All request for bid packages must be submitted in writing to this office accompanied by a check or money order payable to U.S. Treasury in the amount of $40.00. No telephone or fax request will be accepted (0165)

Loren Data Corp. http://www.ld.com (SYN# 0251 19950615\Z-0068.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page