|
COMMERCE BUSINESS DAILY ISSUE OF JUNE 5,1995 PSA#1360U.S. ARMY CORPS OF ENGINEERS, 502 EIGHTH STREET, HUNTINGTON, WV
25701-2070 Y -- ICE BOOM AT ROBERT C. BYRD LOCKS & DAM, OHIO RIVER, WEST VIRGINIA
SOL DACW69-95-B-0026 DUE 080295 POC Contact Point, Ronald F. Vest,
(304)529-5040, Contracting Officer, ROBERT B. TUCKER, (304)529-5619 The
subject work consists essentially of fabricating aluminum floats and
aluminum pontoons, constructing an upstream concrete anchor, providing
a downstream floating trolley and installing the complete ice boom
across the intake channel on the Ohio River at Robert C. Byrd Locks &
Dam. The estimated cost range of the project is from $500,000.00 to
$1,000,000.00. The cost for solicitation documents is $16.00 for Half
Scale and $24.00 for Full Scale. The charge is non-refundable. Make
check payable to: FAO USAED, ORD. (0152) Loren Data Corp. http://www.ld.com (SYN# 0161 19950602\Y-0025.SOL)
Y - Construction of Structures and Facilities Index Page
|
|