COMMERCE BUSINESS DAILY ISSUE OF june 1,1995 PSA#1358U. S. Army Corps of Engineers, 600 Dr. Martin Luther King Jr. Place,
Room 821, Louisville, Kentucky 40202-2230 C -- TWO INDEF. DEL. CONTRACTS FOR A-E SVCS. FOR EARTHQUAKE EVALUATION
& DYNAMIC DESIGN & ANALYSIS OF MAJOR NAVIGATION STRUCTURES &
SUBSTRUCTURES WITHIN THE LOUISVILLE DISTRICT(IL, IN, KY AND OH) POC
Contact Mrs. Robin Woodruff, (502) 582-5598 1. CONTRACT INFORMATION:
The proposed services will be obtained by a negotiated Firm Fixed Price
Contract. The maximum amount of the contract shall not exceed
$750,000.00, and no individual delivery order shall exceed $150,000.00.
The contract period is one year from date of award, with an option for
one additional year with an additional ceiling amount of $750,000.00.
Before award of this contract, the firm (if not a small business
concern) shall be required to present an acceptable Small Business and
Small Disadvantaged Business Subcontracting Plan in accordance with
Public Law 95-507. To meet the current subcontracting goals, 69% of the
total subcontracted dollars must go to small business firms, 6.3% must
go to small disadvantaged business firms, and 2.9% must go to
woman-owned firms. The plan is not required with this submittal. 2.
PROJECT INFORMATION: Expected project activities would involve the
evaluation of earthquake ground motion using deterministic and
probabilistic seismic hazard analysis approaches. In addition, the
evaluation of time dependent loadings and design application of dynamic
loading to soil and pile founded massive concrete hydraulic structures
using two-dimensional and three-dimensional soil-pile- structure
interaction models may be required. Primary effort will pertain to the
Olmsted Locks and Dam now under design and construction in the Ohio
River between Kentucky and Illinois. However, delivery orders could be
issued for work at other locations within the Louisville District. 3.
SELECTION CRITERIA: See Note 24 for general selection process
information. The selection criteria in descending order of importance
(first by major criterion and then by each sub- criterion) are listed
below. Criteria a-d are primary and e-h are secondary: a. Qualified
registered professional engineers (designers and checkers) with
expertise pertaining to the above project information data. Firms
should provide resumes in the SF 255 for the team designers and
checkers. b. Specialized experience, including documented experience
(i.e., Engineering Awards and/or published work, etc.), and technical
competence in earthquake ground motion evaluation; design and analysis
of massive concrete hydraulic structures (locks, dams, approach walls,
stilling basins, etc.) founded on soil and/or pile foundations; seismic
analysis of soil-pile-structure interaction; application of programs,
such as SASSI, FLUSH, etc. in the design of hydraulic structures; and
experience in hazard analysis for central United States seismic zones.
c. Capacity to complete the work in the required time. d. Past
performance on DOD and other contracts with respect to cost control,
quality of work, and compliance with performance schedules. e.
Geographical location and knowledge of the locality of the project. f.
Volume of DOD contract awards in the last 12 months as described in
Note 24. g. Superior performance evaluations on recently completed DOD
contracts. h. Extent of participation of SB, SDB, historically black
collages and universities, and minority institutions in the proposed
contact team, measured as a percentage of the estimated effort. 4.
SUBMITTAL REQUIREMENTS: a. See Note 24 for general submission
requirements. Firms which are interested and meet the requirements
described in this announcement are invited to submit one completed SF
255 (Revision 11-92), U.S. Government A/E and Related Services for
Specific Projects to the office shown above. SF 255 (Revision 10-83) is
obsolete and only the 11-92 edition of SF 255 will be accepted. All
responses on SF 255 to this announcement must be received no later than
4:30 pm Local Time on the 30th calendar day after the date of this
publication to be considered for selection. The day following this CBD
announcement counts as day number 1. If the 30th day falls on
Saturday, Sunday or a U. S. Gov't. holiday, the deadline is the close
of business on the next Gov't. business day. b. It is requested that
interested firms list the fee amount and date of all DOD contracts
awarded during the last 12 months to the firm and all subsidiaries in
Block 9 of the SF 255. c. Responding firms must submit a current and
accurate SF 254 for each proposed consultant. Additionally, all
responding firms which do not have a current (within the past 12
months) SF 254 on file with the North Pacific Division, Corps of
Engineers, must also furnish a completed SF 254. If a SF 254 is
included, only the 11-92 edition of the form will be accepted. The
business size status (large, small and/or minority) should be indicated
in Block 3 of the SF 255. Definition: A concern is small if the annual
receipts averaged over the past 3 fiscal years do not exceed $2.5
million. d. No other information including pamphlets or booklets is
requested or required. e. No other general notification to firms under
consideration for this project will be made and no further action is
required. Solicitation packages are not provided for A/E contracts.