COMMERCE BUSINESS DAILY ISSUE OF may 25,1995 PSA#1354USPFO For Alabama, MSgt Lanier, P.O. Box 3715, Montgomery, AL
36109-0715 Y -- UPGRADE DRAINAGE SYSTEM, BIRMINGHAM INTERNATIONAL AIRPORT (ANG),
BIRMINGHAM, AL SOL DAHA01 95 B 0011. POC MSgt Lanier (334) 213-7515,
Contract Specialist. Project consists of furnishing all labor,
materials and equipment required to perform all work in strict
accordance with specifications, schedules, and drawings to Upgrade
Drainage System. The work consists of the removal of a portion of
existing paving, excavating site, including removal of existing
drainage piping, replacing existing soil with engineered fill under
walks, pavement, and grass areas, replacement of asphalt and portland
cement pavement, curb, concrete pipe, headwalls, junction boxes, inlets
and trench drains, placement of new chain link fence and gates,
excavation and landscaping of ponds, relocation of existing utilities,
excavation testing of contaminated soil, placement of flow control
devices in ponds. Estimated cost of construction is between
$1,000,000.00 and $5,000,000.00. A non-refundable check of $75.00 made
payable to the A&FO, Tyndall AFB, FL is required for each set of plans
and specifications. Plans, specifications and bid documents are
available from the USPFO for Alabama, ATTN: AL-US-P, P.O. Box 3715,
Montgomery, AL 36109-0715. Plans and specifications will be available
for reviewing at the F.W. Dodge Plans Room, Birmingham, AL,
Construction Market data (CMD), Birmingham, AL, and at the office of
the Base Civil Engineer, Birmingham International Airport (ANG),
Birmingham, AL. This project is 100% unrestricted. IFB Number DAHA01 95
B 0011, will be issued with an anticipated issue date of June 16, 1995,
with Bid Opening on or about July 18, 1995. (142) Loren Data Corp. http://www.ld.com (SYN# 0110 19950524\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|