COMMERCE BUSINESS DAILY ISSUE OF may 24,1995 PSA#1353NASA, Johnson Space Center, BJ32, Houston, TX Z -- MODS TO JAKE GARN FACILITY - BUILDING 5 SOUTH SOL 9BJ3T24519B POC
VALERIE MARBURGER, Tel:713-483-4214 Contracting Officer:ROD ETCHBERGER,
Tel:713-483-8530 This project is for interior modifications to the high
bay area of the Jake Garn Mission Simulator and Training Facility,
Building 5 South, to accommodate Space Station trainers and mock-ups.
Work includes construction of a two-level extension to the existing
mezzanine in the high bay, room 1120 complete with raised computer
flooring and all supporting utility systems; i.e., electrical,
mechanical, plumbing, etc. Structural modifications involve new drilled
piers and structural steel framing for the mezzanine extension.
Additional work involves construction of stairs, a multi-level caged
storage area accessable from both the first and second floor levels and
mods to the existing fire detection and protection systems. The period
of performance is 245 days. Estimated budget is between $250,000 and
$500,000. SIC: 1541. Bid documents may be purchased from: Ridgeway,
Inc., Attn: Bill Dement, 5711 Hillcroft, Houston, TX 77036, Phone:
713-787-1265. Documents may be viewed at Industry Assistance, Building
111, NASA JSC, 713-483-4511 (0142) Loren Data Corp. http://www.ld.com (SYN# 0117 19950523\Z-0026.SOL)