|
COMMERCE BUSINESS DAILY ISSUE OF MAY 22,1995 PSA#1351Supplies Division, Fifth District Port Construction, Bureau, Ministry
of Transport, 2 Tsukiji-Cho, Minato-Ku, Nagoya-Shi 455, Japan 99 -- JAPAN: POC Tel 81/52/651-6261 FAX N/A S16 Construction product
data a industry sector code: B detailed product description:
Construction Title: Construction of the South temporary revetment,
kasumigaura North pier, Port of yokkaichi; site: 2-8-chisaki kasumi,
yokkaichi-Shi (base for steel plate cellular blocks: 1-29 kasumi,
yokkaichi-Shi); summary: Construction and removal of the base for
preparation of cellular blocks: approx. 35,000 square meters area;
banking with approx. 11,700 cubic meters of available soil, approx.
2,700 cubic meters of crushed stones, and 962 meters of drainage work;
temporary work: temporary materials for preparation and concreting of
cellular blocks; main structure work: preparation (including
concreting) of 34 steel plate cellular blocks of 13,000 millimeters
outer diameter, 12,500 millimeters height, and approx. 1,600 tons total
weight; preparation (including concreting) of 68 steel plate arcs of
approx. 6,700 millimeters outer circumference, 12,500 millimeters
height, and approx. 500 tons total weight; filling with approx. 30,000
cubic meters of filling materials for cellular blocks and approx.
9,000 cubic meters of filling materials for arcs; waterproofing work;
approx. 1,800 cubic meters of concrete covering; superstructure work:
approx. 1,100 cubic meters of superstructure concreting; approx. 5,600
cubic meters of backfilling stones; installation of measurement
devices (for distortion and inclination); Construction period: approx.
Nine months (270 days); main materials to be used: crane (at the yard
for preparation of cellular blocks at the time of Construction and
lifting); crane boat (at the time of Transport, lifting, and
concreting); filling materials, approx. 39,000 cubic meters (excluding
extra allowances); steel, approx. 2,100 tons; backfilling stones,
approx. 5,600 cubic meters (excluding extra allowances); concrete,
approx. 2,900 cubic meters. C product specifications/technical data:
N/a D quantity: N/a e U.S. dollar value: N/a F other information: N/a
response data a response language: Japanese. B best way to respond:
letter. C from manufacturers only: N/a D information desired from U.S.
firm: N/a e primary buying factor: the lowest bid within the estimated
price range. F other information: pre-screening required to be eligible
for bidding. Pre-screening deadline: 16:00 pm, May 29, 1995. Bid
documents must be obtained directly from the submitting agency, not
from U.S. Embassy. Payment in yen. A issuing agency: Fifth District
Port Construction Bureau, Ministry of Transport B financing agency:
same as above. C price of bid documents: N/a D purchase bid documents
by: June 26, 1995. E tender number required in all communications: N/a
F performance bonds required: not required. G closed procurement
procedure: N/a H bidding procedures: open competitive tender. I bid
deadline: 14:00 pm, July 7, 1995. J other information: '' kensetsu
kogyo shimbun'': 5/17/95. Eligible tender participants: 1) firms that
do not fall under articles 70 and 71 of the cabinet order concerning
budget, auditing, and accounting; 2) firms pre-qualified for open
competitive bidding on Port Construction work by the Fifth District
Port Construction Bureau; 3) firms that score at least 1,300 points in
Port Construction work in a formula calculated from bidding company'
s objective criteria at the time of application for qualification; 4)
firms that have -- since 1985 as the main contractor -- actually
carried out Construction of a revetment or quaywall, embedding steel
plate cellular blocks by the crane boat on the sea; 5) firms that can
assign to the Construction site a full-time chief engineer or
engineering supervisor who meets the following criteria: a) is
qualified as a certified first-class Construction supervisor; B) has
since 1985 had experience with a project as described in item (4) above
as chief engineer, engineering supervisor, or field representative; and
C) in the case of engineering supervisor, is qualified to supervise
designated Construction works; 6) firms not currently suspended from
designation by the Director of the Fifth District Port Construction
Bureau; and 7) firms not undergoing bankruptcy procedures. This project
is open only to pre-qualified consortia as separately announced. Post
remarks Post contact/prepared by haomori approved by gtaevs Please send
a copy of your response to: Commercial Officer (FCS TOP), American
Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC388.. (0138) Loren Data Corp. http://www.ld.com (SYN# 0363 19950519\99-0001.SOL)
99 - Miscellaneous Index Page
|
|