Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 22,1995 PSA#1351

Supplies Division, Fifth District Port Construction, Bureau, Ministry of Transport, 2 Tsukiji-Cho, Minato-Ku, Nagoya-Shi 455, Japan

99 -- JAPAN: POC Tel 81/52/651-6261 FAX N/A S16 Construction product data a industry sector code: B detailed product description: Construction Title: Construction of the South temporary revetment, kasumigaura North pier, Port of yokkaichi; site: 2-8-chisaki kasumi, yokkaichi-Shi (base for steel plate cellular blocks: 1-29 kasumi, yokkaichi-Shi); summary: Construction and removal of the base for preparation of cellular blocks: approx. 35,000 square meters area; banking with approx. 11,700 cubic meters of available soil, approx. 2,700 cubic meters of crushed stones, and 962 meters of drainage work; temporary work: temporary materials for preparation and concreting of cellular blocks; main structure work: preparation (including concreting) of 34 steel plate cellular blocks of 13,000 millimeters outer diameter, 12,500 millimeters height, and approx. 1,600 tons total weight; preparation (including concreting) of 68 steel plate arcs of approx. 6,700 millimeters outer circumference, 12,500 millimeters height, and approx. 500 tons total weight; filling with approx. 30,000 cubic meters of filling materials for cellular blocks and approx. 9,000 cubic meters of filling materials for arcs; waterproofing work; approx. 1,800 cubic meters of concrete covering; superstructure work: approx. 1,100 cubic meters of superstructure concreting; approx. 5,600 cubic meters of backfilling stones; installation of measurement devices (for distortion and inclination); Construction period: approx. Nine months (270 days); main materials to be used: crane (at the yard for preparation of cellular blocks at the time of Construction and lifting); crane boat (at the time of Transport, lifting, and concreting); filling materials, approx. 39,000 cubic meters (excluding extra allowances); steel, approx. 2,100 tons; backfilling stones, approx. 5,600 cubic meters (excluding extra allowances); concrete, approx. 2,900 cubic meters. C product specifications/technical data: N/a D quantity: N/a e U.S. dollar value: N/a F other information: N/a response data a response language: Japanese. B best way to respond: letter. C from manufacturers only: N/a D information desired from U.S. firm: N/a e primary buying factor: the lowest bid within the estimated price range. F other information: pre-screening required to be eligible for bidding. Pre-screening deadline: 16:00 pm, May 29, 1995. Bid documents must be obtained directly from the submitting agency, not from U.S. Embassy. Payment in yen. A issuing agency: Fifth District Port Construction Bureau, Ministry of Transport B financing agency: same as above. C price of bid documents: N/a D purchase bid documents by: June 26, 1995. E tender number required in all communications: N/a F performance bonds required: not required. G closed procurement procedure: N/a H bidding procedures: open competitive tender. I bid deadline: 14:00 pm, July 7, 1995. J other information: '' kensetsu kogyo shimbun'': 5/17/95. Eligible tender participants: 1) firms that do not fall under articles 70 and 71 of the cabinet order concerning budget, auditing, and accounting; 2) firms pre-qualified for open competitive bidding on Port Construction work by the Fifth District Port Construction Bureau; 3) firms that score at least 1,300 points in Port Construction work in a formula calculated from bidding company' s objective criteria at the time of application for qualification; 4) firms that have -- since 1985 as the main contractor -- actually carried out Construction of a revetment or quaywall, embedding steel plate cellular blocks by the crane boat on the sea; 5) firms that can assign to the Construction site a full-time chief engineer or engineering supervisor who meets the following criteria: a) is qualified as a certified first-class Construction supervisor; B) has since 1985 had experience with a project as described in item (4) above as chief engineer, engineering supervisor, or field representative; and C) in the case of engineering supervisor, is qualified to supervise designated Construction works; 6) firms not currently suspended from designation by the Director of the Fifth District Port Construction Bureau; and 7) firms not undergoing bankruptcy procedures. This project is open only to pre-qualified consortia as separately announced. Post remarks Post contact/prepared by haomori approved by gtaevs Please send a copy of your response to: Commercial Officer (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC388.. (0138)

Loren Data Corp. http://www.ld.com (SYN# 0363 19950519\99-0001.SOL)


99 - Miscellaneous Index Page