|
COMMERCE BUSINESS DAILY ISSUE OF MAY 19,1995 PSA#1350NASA, John F. Kennedy Space Center, Kennedy Space Center, FL 32899 Z -- REHABILITATE BUILDING M7-505 HVAC AND ROOF - PHASE I SOL IFB
10-95-0039 DUE 070695 POC Jack Massey, Contracting Officer, OP-ESO-A,
407-867-7230. The work to be performed consists of providing all
management, labor, equipment and materils to Rehabilitate Building
M7-505 HVAC and Roof - Phase I, Kennedy Space Center. The project scope
requires the contractor to replace six DX-air conditioning units with
chilled water air handling units at Building M7-505. Included in the
work is asbestos abatement, demolition of piping, ductwork, new
equipment, piping, ductwork, and insulation, controls and electrical
service, and, necessary ancillary work. All work is to be accomplished
in accordance with KSC Drawing 79K33958 and KSC Specification
79K33959.--Plan to issue sol. pkg. on or about 06/06/95.--Magnitude of
project between $250,000 to $500,000.--Period of performance: 240
calendar days.Point of contact for sol. pkg. Mail Code: ATS-PROm
407-867-2851 or FAX request 407-867-9187.--All responsible sources may
submit a bid/proposal which shall be considered by the agency. (0137) Loren Data Corp. http://www.ld.com (SYN# 0205 19950518\Z-0034.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|