Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MAY 19,1995 PSA#1350

NASA, John F. Kennedy Space Center, Kennedy Space Center, FL 32899

Z -- REHABILITATE BUILDING M7-505 HVAC AND ROOF - PHASE I SOL IFB 10-95-0039 DUE 070695 POC Jack Massey, Contracting Officer, OP-ESO-A, 407-867-7230. The work to be performed consists of providing all management, labor, equipment and materils to Rehabilitate Building M7-505 HVAC and Roof - Phase I, Kennedy Space Center. The project scope requires the contractor to replace six DX-air conditioning units with chilled water air handling units at Building M7-505. Included in the work is asbestos abatement, demolition of piping, ductwork, new equipment, piping, ductwork, and insulation, controls and electrical service, and, necessary ancillary work. All work is to be accomplished in accordance with KSC Drawing 79K33958 and KSC Specification 79K33959.--Plan to issue sol. pkg. on or about 06/06/95.--Magnitude of project between $250,000 to $500,000.--Period of performance: 240 calendar days.Point of contact for sol. pkg. Mail Code: ATS-PROm 407-867-2851 or FAX request 407-867-9187.--All responsible sources may submit a bid/proposal which shall be considered by the agency. (0137)

Loren Data Corp. http://www.ld.com (SYN# 0205 19950518\Z-0034.SOL)


Z - Maintenance, Repair or Alteration of Real Property Index Page