|
COMMERCE BUSINESS DAILY ISSUE OF MAY 1,1995 PSA#1336CHIEF ACQUISITION & MATERIEL MANAGEMENT 90C, DEPARTMENT VA LAKESIDE
MEDICAL CENTER, 333 E. HURON, CHICAGO, IL 60611-4494 C -- TB VENTILATION CCU, MICU, & SICU SOL 535-95-102 DUE 053195 POC
Contact Point, Noble Stemmons, (312)640-2219, Contracting Officer,
Noble Stemmons, (312)640-2219 Architect/Engineer services are required
to develop complete working drawings, specifications, asbestos
abatement plan including asbestos monitoring, detailed cost estimate,
as built drawings, and construction period services. The design work
involves the replacement of two air handling units and exhaust fans,
modification of HVAC ductwork and components to provide proper
ventilation in patient areas to meet HVAC design criteria and CDC
guidelines; implementation of direct digital control of the modified
systems; and removal of asbestos containing materials in plumbing and
HVAC systems. The estimated construction cost is between $250,000 and
$500,000. The area of consideration is restricted to concerns within a
100 mile radius of Chicago, Illinois. All interested firms should
submit the appropriate data, as described in numbered Note 24, to the
Contracting Officer before the close of business May 31, 1995. THIS IS
NOT A REQUEST FOR A PROPOSAL. (0117) Loren Data Corp. http://www.ld.com (SYN# 0024 19950428\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|