COMMERCE BUSINESS DAILY ISSUE OF APRIL 6,1995 PSA#1319Contract Section, Administration Division, Hanshin Expressway Public
Corporation, 4-1-3 Kyutaro-Cho, Chuo-Ku, Osaka-Shi 541, Japan 99 -- JAPAN: POC Tel 81/6/252-8121 FAX N/A S16 construction product
data a industry sector code: B detailed product description:
construction Title: construction of steel girder at no. 7 site for
reconstruction of no. 3 kobe Expressway; site: fukae- minami-machi,
nada-Ku, kobe-Shi; summary: style: 9-span continuous, steel surface
slab, box girders, 2 sets; bridge length: 320 (36 X 5 + 35 X 4) meters
and 315 (35 X 9) meters; total width: 20.25 meters; bridge area:
12,840 square meters; work: manufacture and construction involving
approx. 3,760 tons of steel; construction period: approx. 18 months;
main materials to be used: approx. 3,760 tons of steel, 40 sets of
support. C product specifications/technical data: N/a D quantity: N/a
e U.S. dollar value: N/a F other information: N/a response data a
response language: Japanese B best way to respond: letter C from
manufacturers only: N/a D information desired from U.S. firm: N/a e
primary buying factor: the lowest bid within the estimated price range.
F other information: pre-screening required to be eligible for bidding.
Pre-screening deadline: apr. 12, 1995. Bid documents must be obtained
directly from the submitting agency, not from U.S. Embassy. Payment in
yen. A issuing agency: Hanshin Expressway Public Corporation B
financing agency: N/a C price of bid documents: N/a D purchase bid
documents by: May 2, 1995. E tender number required in all
communications: N/a F performance bonds required: not required. G
closed procurement procedure: N/a H bidding procedures: open
competitive tendering. I bid deadline: 11: 00, May 12, 1995. J other
information: ''kensetsu kogyo shimbun'': 4/3/95. Eligible tender
participants: 1) firms that do not fall under article 2 of the Hanshin
Expressway Public Corporation regulations on selection of contractors;
2) firms pre- qualified for open competitive tendering on steel bridge
construction by the Hanshin Expressway Public Corporation; 3) firms
that score at least 700 points in a formula calculated from bidding
company's objective criteria at the time of application for
qualification; 4) this bidding is open to single entities or consortia
comprised of two firms that have construction experience; 5) firms
that have -- since 1990 as the main contractor -- actually designed,
manufactured, and constructed an at least 3-span continuous, steel
surface slab girder of about 20 meters width; note: only construction
projects in which bidder has had a 30 percent or greater share are
eligible for review; 6) firms that can assign to the construction site
a field representative or a full-time chief engineer or engineering
supervisor who meets the following criteria: a) is qualified as a
certified first-class construction supervisor or engineer in
construction; B) has since 1990 had experience with bridge construction
on a main Road as field representative, or chief engineer or
engineering supervisor; and C) in the case of engineering supervisor,
is qualified to supervise designated construction works; 7) firms not
currently suspended from designation by the Hanshin Expressway Public
Corporation; 8) firms not related by capital or personnel to the
contractors involved in this project; and 9) in the case of forming a
consortium, refer to bidding documents. Post remarks Post
contact/prepared by haomori approved by gtaevs Please send a copy of
your response to: Commercial Officer (FCS TOP), American Embassy,
Tokyo, APO Ap 96337, Refer to TC334. . (0094) Loren Data Corp. http://www.ld.com (SYN# 0435 19950405\99-0003.SOL)