Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF APRIL 3,1995 PSA#1316

NASA Langley Research Center, MS 144, Industry Assistance Office Hampton, Va. 23681-0001

61 -- DESIGN, FURNISH AND INSTALL A 100 MEGAWATT ADJUSTABLE SPEED DRIVE SYSTEM FOR THE NATIONAL TRANSONIC FACILITY, NASA LANGLEY RESEARCH CENTER, HAMPTON, VIRGINIA SOL 1-64-GGH.1567 DUE 061495 POC Bid Distribution Office,(804)864-2547. The system requirements are as follows: 1. Design and manufacture of an input/isolation transformer, load commutated inverter speed controller, and synchronous motor to replace the existing drive system at NTF. 2. Demolition of the existing drive line consisting of motors, gearboxes, clutches, and liquid rheostats. 3. Perform design and analysis to interface the new drive system with the existing utilities, foundations, and tunnel fan. 4. Installation of all new equipment within existing real-estate, and 5. Integration and commissioning of all new equipment with the existing NTF subsystems. The Contractor shall be required to furnish training and six (6) months of on-call maintenance service. Quantity: 1 system. The period of performance is thirty (30) months from the effective date of the contract. FOB destination delivery. Solicitation available approximately May 1, 1995. All responsible sources may submit a proposal which shall be considered by the Agency. Note 12 (Trade Agreements) (0089)

Loren Data Corp. http://www.ld.com (SYN# 0362 19950331\61-0003.SOL)


61 - Electric Wire and Power and Distribution Equipment Index Page