COMMERCE BUSINESS DAILY ISSUE OF MARCH 17,1995 PSA#1305USDA Forest Service, Mt. Hood National Forest, 2955 NW Division Street,
Gresham, OR 97030 Y -- CONSTRUCT MOTORCYCLE TRAILS SOL R6-6-95-239 due 050295. POC
Contracting Section, 503/666-0621. This work consists of the
construction of motor cycle trails, the excavation and placement of all
excavated material, regardless of its nature, from within the trailway
limits or from other sources. Included shall be the excavation and
embankment construction required to shape and finish the trailbed,
ditches, backslopes, fill slopes, drainage dips, and passing sections.
Also included is all work required to construct shallow stream fords
and gulley crossings, talus and rubble rock sections, and rock or log
retaining walls. The construction of these motorcycle trails consists
of clearing and grubbing, excavation of trail tread, constructing and
installing continuous belting waterbars. This work shall be done on the
Bear Springs Ranger District of the Mt. Hood National Forest, Oregon.
Desired Start Work Date is June 12, 1995. Recommended contract time is
90 calendar days. The Government's Estimate is between $25,000 and
$100,000. See Numbered Note 3. (073) Loren Data Corp. http://www.ld.com (SYN# 0167 19950316\Y-0016.SOL)