Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF MARCH 15,1995 PSA#1303

Commander Maintenance & Logistics Command Atlantic Bldg. 400M, Rm 202 Governors, Island, NY

J -- DRYDOCK REPAIRS TO THE USCGC SCIOTO (WLR-65504) SOL DTCG80-95-B-3FA805 DUE 050295 POC Diane Lugo, Contract Specialist 212 668-3376 Patricia Morgan Contracting Officer 212 668-3451. Provide all labor, material and equipment necessary to perform routine drydock vessel maintenance including but not limited to the following base item: 1. overhaul, renew and test valves 2. inspect, overhaul and test barge boat davit 3. overhaul barge spud winch and capstan 4. inspect, overhaul and test Allied aton crane 5. clean, inspect diesel fuel tanks 6. remove, dispose, and provide new fuel oil (10,000 gallons) 7. preserve potable water tank 8. temporary logistics 9. routine drydocking 10. modify bow structure and replace tender/barge interface 11. renew ship service diesel generators 12. upgrade power lighting system 13. upgrade engine room ventilation room 14. fabricate and install new sewage tank 15. install aft ballast tank . Optional items include but are not limited to the following items: 1. welding repairs 2. remove, inspect, and reinstall tail shafts 3. renew shaft 4. renew shaft strut barrel 5. blast diesel fuel tanks 6. preserve underwate body 7. renew corrosion preventive zinc anodes 8. ultrasonic testing 9. post drydock alignment inspection 10. alignment inspection -- homeport is Keokuk, IA, vessel lenght is 65' 10'' and Barge lenght is 100' 0'' -- availability schedule is 15 May 1995 -- the place of performance for CGC Scioto's May 1995 yard availability is restricted to the Western Rivers of the United States. The ''Western River'' means the navigable portions of the Mississippi River and its tributaries above mile 0 of the Lower Mississippi River. Navigable tributaries of the Mississippi River include only the waterways within the areas of jurisdiction of the CoastGuard Aids to Navigation Facilites as described in Light List Volume V (COMDTINST M16502.5), and the Tenessee-Tombigbee Waterway to the Mouth of the Mobile River. This includes the protected portions of the Intra Coastal Waterway connected to the ''Western River'' but specifically excludes unprotected or open waters such as Mobile Bay, Lake Borne, or the Gulf of Mexico. There will be non-refundable charge required in the form of a certified check or money order`made payable the United States Coast Guard in the amount of $100.00 for requested specification and drawings -- the prosed contract listed here is part of the Small Business Competitiveness Demostration Program and is open to both large and Small Business -- plans and specifications will be issued on or after 29 March 1995 -- All responsible sources may submit a bid which shall be consider by the United States Coast Guard. For minority, women-owned and disadvantage business enterprises: The Department of Transportation office of Small and Disadvantaged Business Utilization has programs to assist minority, women-owned and disadvantage business enterprises to aquire short term working capital and bonding assistance for transportation-related contracts. Loans are available under the DOT Short-Term Lending Program (STLP) at prime interest rates up $500,000 per contract tp provide accounts receiving financing. The DOT Bonding Assistance programs enable firms to aplly for bid, performance and payment bonds up to $500,000 per contract. DOT provides an 80% guaranty on the bond amount to a surety against losses. For further information and applicable forms concerning the (STLP) and Bonding Assistance Program, Please call (800) 532-1169 (0072)

Loren Data Corp. http://www.ld.com (SYN# 0022 19950314\J-0001.SOL)


J - Maintenance, Repair and Rebuilding of Equipment Index Page