COMMERCE BUSINESS DAILY ISSUE OF MARCH 14,1995 PSA#1302Department of the Army, New England Division, Corps of Engineers, 424
Trapelo Road, Waltham, Massachusetts 02254-9149 Z -- REPLACE FUEL TANKS, BALL MOUNTAIN/TOWNSHEND LAKE, VERMONT SOL
DACW33-95-B-0056 DUE 060195 POC Jerry Nunziato, 617-647-8424 The work
of this project consists of removing, and disposing of five fuel tanks,
with all piping, located at two sites. Three 275 gallon fuel tanks are
located in the Ball Mountain Dam Flood Control Tower, one 275 gallon
fuel tank is in the Townshend Lake Dam Flood Control Tower and one 350
gallon fuel tank is located under deck of the Townshend Lake Dam Flood
Control Tower Service Bridge. Tanks and piping shall be replaced with
new double wall tanks and new pipes. All tanks and piping shall be
removed, stored, transported, and disposed of in accordance with all
Federal, State and local Laws and regulations. Estimated cost of the
work is between $25,000.00 and $100,000.00. Work shall be completed
within 60 calendar days. Plans and specifications available on or about
042195 at a cost of $11.00 per set. All responsible sources may submit
a bid which will be considered by the New England Division. (0069) Loren Data Corp. http://www.ld.com (SYN# 0144 19950313\Z-0030.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|