Ecology and Environment, Inc., 111 West Jackson Blvd., Chicago, IL 60604

Y -- DECONTAMINATE ABOVE/UNDERGROUND TANKS/EQUIPMENT VAULTS, DEMOLISH ABOVEGROUND TANKS; INSTALL GROUNDWATER/NAPL EXTRACTION SYSTEM; CONSTRUCT GROUNDWATER TREATMENT SYSTEM/BUILDING SOL ZI6083. POC Project Manager, Benjamin L. Horenziak, PE, 312/663-9415. Solicitations are requested for services for remediation of a US EPA Superfund project involving hazardous wastes associated with a former pentachlorophenol wood treating facility in New Brighton, Minnesota. The project implements an Interim Remedial Action at the MacGillis and Gibbs/Bell Lumber and Pole Superfund Site. This action requires the removal of liquids and sludges from 10 ASTs, 8 USTs, and 3 underground equipment vaults (vaults), the decontamination of ASTs, USTs and vaults, the demolition of the ASTs, one extraction well, a groundwater extraction system, a non-aqueous phase liquid extraction system, waste disposal, groundwater treatment system and discharge pressure main. Construction is anticipated to be completed within 6 months of NTP and O&M is to continue for 1 year after notice of ``On-line Status''. This description of the work to be performed is not intended to be all encompassing for the total project. A full description of the work to be completed is included in the detailed plans and specifications (design sets) available from the above stated address. Interested parties may obtain copies of design sets upon payment of $100 in check or money order, payable to Ecology and Environment, Inc., in U.S. funds drawn upon a U.S. bank for each complete set. Cash will not be accepted. Requests for design sets should be sent to the project manager and must include the name of the person to receive the design set, the physical address of that person and the phone number. Design sets will be sent by express courier on March 15, 1995. Bids will be due April 15, 1995. A pre-bid meeting is scheduled of March 23, 1995 at a location near to the site. Exact time and location will be included in the cover letter accompanying the design sets. Prospective bidders are advised of the following conditions: 1) Site access is restricted. 2) Personnel entering or performing work on the site will require medical monitoring and safety training in compliance with 29 CFR 1910.120. 3) Statements of safety training and medical fitness in compliance with 29 CFR 1910.120 are required from all parties prior to entering upon the site for any purpose, including the pre-bid site inspection. 4) The format for these statements is included in the design set. 5) All requests for information must be in writing. 6) A formal response to inquiries will be sent to parties receiving design sets. (066)

Loren Data Corp. http://www.ld.com (SYN# 0116 19950309\Y-0004.SOL)


Y - Construction of Structures and Facilities Index Page