|
COMMERCE BUSINESS DAILY ISSUE OF MARCH 3,1995 PSA#1295Purchasing and Contracting, Mail Stop 53, 660 South Aspen Street,
Buckley Air National Guard Base, Aurora, CO 80011-9551 C -- ADAL MEDICAL TRAINING BUILDING Sol DAHA05-95-R-5006. Contact Jack
Murphy, Contract Specialist, (303) 340-9946, or David Cole, Contracting
Officer, (303) 340-9945. This project is to provide
Architectural-Engineering (A-E) Services for investigation, design and
construction inspection for ADAL Medical Training Facility, Project
CRWU 949524, at Buckley Air National Guard Base, Aurora, Colorado.
Services required are investigation and design analysis (Type A
Services), preparation of construction documents (Type B Services),
and, at the option of the government, construction supervision and
inspection (Type C Services). The project shall consist of 2,200 square
foot (more or less) addition to an existing medical training facility.
Work will include, but is not limited to mechanical, electrical, and
fire protection. Estimated cost of construction is between $250,000 and
$500,000. The proposed services will be procured by a negotiated
fixed-price contract. Estimated design start date is 30 May 1995.
Significant evaluation factors and their relative order of importance
in the selection process are as follows: (1) Professional
qualifications necessary for satisfactory performance of the required
services. (2) Specialized experience and technical competence in the
type of work required. (3) Capacity and resources to accomplish the
work in the required time. (4) Past performance on contracts with
government agencies and private industry in terms of cost control,
quality of work and strict compliance with performance schedules. (5)
Location in the general geographic area of the project and knowledge of
the locale of the project. (6) Quantity of work awarded with DOD
agencies in the last twelve months. Firms meeting requirements
described in this announcement and wishing to be considered must submit
copies of SF 254 and SF 255 on or before 4:00 P.M., 30 days from the
date of appearance of this announcement in the CBD. Should the due date
fall on a weekend or holiday, the SF 254 and SF 255 will be due the
first weekday thereafter. This is not a Request for Proposal. Site
visits will not be arranged during the submittal period. The SIC Code
is 8712, and having annual receipts of $2.5 million or less. See
Numbered Note 1. (060) Loren Data Corp. http://www.ld.com (SYN# 0041 19950302\C-0019.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|