Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 23,1995 PSA#1289

U.S. Property & Fiscal Office for the District of Columbia, Bldg 350, Anacostia Naval Air Station, Washington, D.C. 20374-5064

R -- ARCHITECT - ENGINEER SERVICES Contact: MSG W. Maddox, 202-433-2511, MAJ E. Wilson, Contracting Officer. INDEFINITE DELIVERY ARCHITECT-ENGINEER SERVICES CONTRACT, $200,000 MAX FEE, 113 CES, DCANG, ANDREWS AFB, MD PROJECT AJXF952899. This is an Open-End contract valid for a period of one (1) year from the date of award with a Government renewal option for one (1) additional year. To assist the Base Civil Engineer, D.C. Air National Guard, perform design of miscellaneous projects for new construction, alterations, maintenance and repair of A-E firm on an as required basis. Services for this contract will include Type A Services (field surveys, investigations and inspections for the design), Type B Services which include: (1) visual inspection of the site, (2) familiarization with the project scope, (3) coordination with the user and reviewing authorities, (4) final inspection report/recommendations, and (5) update of as-built drawings. The type of projects to be awarded under this contract may but are not limited to the following: (1) electrical renovation and upgrade, (2) HVAC replacement and upgrade, (3) energy conservation, (4) architectural alterations, (5) roofing repair/replacement, (6) pavement repair, (7) Grade and subgrade drainage; etc., to be determined by the Base Civil Engineer. Negotiations will be conducted with the A-E to derive hourly pay rates by discipline, and to arrive at a firm lump sum price for each delivery order under this contract. The following guidelines, in order of importance, will be used in the evaluation of A/E firms: (1) Experience in multi-discipline type projects, (2) Specialized experience, (3) Professional capacity of the firm to accomplish the proposed work within the scheduled timeframe, (4) Ability to accomplish several projects concurrently, (5) Geographic location, (6) Past experience, and (7) Current DOD workload. Firms which meet the requirements described in the announcement and desire consideration should submit the following: (1) Completed SF 254 and SF 255, (2) Statement of DOD workload, (4) References from five previous Government projects, include a point of contact and current telephone, and (5) organization chart of the firm and subcontractors. Firms responding to this announcement within thirty (30) days after publication will be considered. Completed SFs 254 and 255 must be submitted by 4:00 p.m. eastern standard time on the closing date. (052)

Loren Data Corp. http://www.ld.com (SYN# 0114 19950222\R-0012.SOL)


R - Professional, Administrative and Management Support Services Index Page