COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 23,1995 PSA#1289Norfolk District, Corps of Engineers, Attn: CENAO-EN-MC, 803 Front
Street, Norfolk, Virginia 23510-1096 C -- ARCHITECT-ENGINEER SERVICES ARE REQUIRED FOR GEOTECHNICAL
ENGINEERING DESIGN FOR VARIOUS PROJECTS UNDER JURISDICTION OF THE U.S.
ARMY ENGINEER DISTRICT, NORFOLK, VA POC Contact Mr. Steve Lantz, (804)
441-7519 A. CONTRACT INFORMATION: A-E services are required as follows:
Geotechnical Design Services include preparation of reports, plans,
specifications, and studies for earthwork structures and building
foundations. Design effort will include foundation investigations,
topographic surveys and associated analyses. Construction related
services including review of shop drawings and site visits during
construction. The type of contract proposed is an Indefinite Delivery
Contract (IDC). The cumulative value of all delivery orders will not
exceed $450,000.00 per year and no one delivery order will exceed
$75,000.00. Each delivery order will be a lump sum, fixed price order.
The contract will be awarded for a period of one year. The contract
will contain an option for one additional year. This announcement is
open to all businesses regardless of size. If a large business is
selected for this contract, it must comply with FAR 52.219-9 and a
Small and Small Disadvantaged Business Subcontracting Plan will be
required. B. SELECTION CRITERIA: The selection criteria in descending
order of importance are: (1) Professional qualifications: The selected
firm must possess experienced, registered, in-house personnel in
Geotechnical Engineering. The in-house geotechnical staff can be
assisted by consultants for highly specialized designs. The firm must
have in-house or by consultant, experienced, registered personnel in
Civil Engineering, Structural Engineering, and Land Surveying. The
selected firm must also possess an in-house soil and materials testing
lab and either an in-house or consultant soil exploration capability
for foundation investigations. (2) Specialized experience and technical
competence: (a) Demonstrated experience by the project team in
foundation investigations and designs, including but not limited to
embankments on soft foundations, vertical strip drains and electric
cone penetration testing, (b) Familiarity with foundation design for
the range of subsurface conditions encountered in Virginia. (3)
Capacity to accomplish the work in the required time: Firms must
demonstrate ability of the team to complete investigations and designs
as scheduled. (4) Past performance on DOD and other contracts: (a)
ACASS evaluations (superior performance evaluations on recently
completed projects is advantageous); (b) Letters of
evaluation/recognition by other clients; (c) On-time delivery of
designs. (5) Volume of DOD contract awards in the last 12 months.
Considerations may include: (a) ACASS retrievals; (b) Current workload
as listed in Block 9 of the SF 255; (c) Equitable distribution of work
among A-E firms. (6) Location in the general geographical area of the
project, is desirable, provided that application of this criterion
leaves an appropriate number of qualified firms, given the nature and
size of the project. C. SUBMISSION REQUIREMENTS: This is not a request
for proposal. Solicitation packages will not be provided. All
requirements of this announcement must be met for a firm to be
considered. Interested firms having the capabilities to perform this
work must submit a single SF 255 for the project team and current SF
254s for the prime firm and all consultants to the above address. The
SF 255 must include the following: (1) Firms with more than one office
- (a) Block 4: Distinguish, by discipline, between the number of
personnel in the office to perform the work and the total number of
personnel in the firm, (b) Block 7c: Each key person's office location;
(2) Block 3: prime firm's ACASS Number and distance from Norfolk,
Virginia; (3) Block 7f: Registrations must include the year and
discipline; (4) Block 8b: Include a descriptive project synopsis of
major items of work; (5) An organizational chart including all key
elements of the investigation team demonstrating the firm's
understanding of and ability to execute the project; and (6)
Information in cover letters will not be considered. The complete
proposal must be received at the address indicated above within 30 days
from the date of this issue in order to be considered. For the purposes
of this notice, day number one is the day following the date of
publication and, should the closing date occur on a weekend or national
holiday, the closing date is automatically extended to the next work
day. Submittals by FAX will not be accepted and considered. Prior to
the final selection, firms considered highly qualified to accomplish
the work may be interviewed either by telephone or by formal
presentation. (0052) Loren Data Corp. http://www.ld.com (SYN# 0026 19950222\C-0005.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|