|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 22,1995 PSA#1288Dept. of the Army, St. Louis District, Corps of Engineers, 1222 Spruce
Street, St. Louis, MO 63103-2833 Y -- DOCK LANDING RAMP, MELVIN PRICE LOCKS AND DAM, UPPER MISSISSIPPI
RIVER BASIN, MISSISSIPPI RIVER, ST. CHARLES COUNTY, MISSOURI AND
MADISON COUNTY, ILLINOIS SOL DACW43-95-B-0248. DUE 041995. Contact
Point, Joan F. Schick, 314-331-8505, Contracting Officer, T.M. Laws,
314-331-8500. Specifications will be available 15 March 1995. Opening
date will be 19 April 1995. The cost of half size plans and specs is
$9.00. The cost of full size plans and specs is $11.00. The duration of
the contract period is 30 days. Estimated cost range of project is from
$50,000 to $100,000. Small and disadvantaged firms are encouraged to
participate as prime contractors or as members of joint ventures with
other small business and all interested contractors are reminded that
the successful contractor will be expected to place subcontracts to the
maximum practicable extent with small and disadvantaged firms IAW the
provisions of Public Law 95.507. All responsible sources may submit a
bid for consideration by the agency. (048) Loren Data Corp. http://www.ld.com (SYN# 0155 19950221\Y-0012.SOL)
Y - Construction of Structures and Facilities Index Page
|
|