|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 22,1995 PSA#1288Dept. of the Army, St. Louis District, Corps of Engineers, 1222 Spruce
Street, St. Louis, MO 63103-2833 Y -- WALKER BRANCH, PHASE 2B, CHANNEL IMPROVEMENTS, CAPE GIRARDEAU -
JACKSON PROJECT, LOWER MISSISSIPPI RIVER BASIN, MISSISSIPPI RIVER, CAPE
GIRARDEAU, MISSOURI SOL DACW43-95-B-0247. DUE 041895. Contact Point,
Joan F. Schick, 314-331-8505, Contracting Officer, T.M. Laws,
314-331-8500. Specifications will be available 14 March 1995. Opening
date will be 18 April 1995. The cost of half size plans and specs is
$20.00. The cost of full size plans and specs is $33.00. The duration
of the contract period is 210 days. Estimated cost range of project is
from $1,000,000 to $5,000,000. Small and disadvantaged firms are
encouraged to participate as prime contractors or as members of joint
ventures with other small business and all interested contractors are
reminded that the successful contractor will be expected to place
subcontracts to the maximum practicable extent with small and
disadvantaged firms IAW the provisions of Public Law 95.507. All
responsible sources may submit a bid for consideration by the agency.
(048) Loren Data Corp. http://www.ld.com (SYN# 0151 19950221\Y-0008.SOL)
Y - Construction of Structures and Facilities Index Page
|
|