|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 2,1995 PSA#1275Operational Contracting Division, 1940 Allbrook Dr, Ste 3, Wright-
Patterson AFB, OH 45433-5309. C -- A-E SERVICES FOR MECHANICAL/ELECTRICAL ID/IQ SOL F33601-95-R-0052
DUE 032095 POC For copy, ASC/PKWO, Attn: Bldg 260, 1940 Allbrook Dr,
Ste 3, WPAFB OH 45433-5309 POC: D DEARDORFF/PKWOE/513-257-6574 Fax No
513-257-3926. Project No. 95-1007. Period of Performance is 365 days.
A one-year option may be awarded. C-Architect-Engineer Service 95-1007,
Indefinite Delivery/Indefinite Quantity Contracts for FY 95-96
Mechanical/Electrical Projects at Wright-Patterson Air Force Base,
Ohio. The scope of the projects will include site vists and
investigations, design and economic analysis, construction drawings and
specifications, survey of facilities for asbestos containing materials
and lead coatings including sampling, testing and abatement design,
detailed cost estimates and a bidding schedule for each project. In
addition to standard hard copy drawings the Architect-Engineer (A-E)
shall be required to produce digitized design documents on 8mm (2.3gb)
tapes or 3 1/2 inch (1.44 megabyte) high density floppy disks
compatible with Intergraph's Interactive Graphics Design Software
(IGDS) format in compliance with the Wright-Patterson CADD Standards
Manual. The significant evaluation factors to be used in the selection
process are as follows: (1) Specialized Experience in designing
projects of a mechanical/electrical effort i.e., alteration and repair
of infra-structure systems, facility electrical, plumbing, fire
suppression and HVAC systems and replacement and repair of
miscellaneous utilities; (2) Professional Qualifications of the staff
to be assigned to this project in the architectural, electrical,
civil/structural, environmental and mechanical disciplines; (3)
Professional Capacity of the A-E firm to accomplish the work within the
anticipated schedule; (4) Past Performance of the A-E firm with respect
to the execution of DOD and other contracts; (5) Location of the A-E
firm in the general geographic area as site visits and Government - A/E
firm interaction will be required; (6) Volume of work previously
awarded to the A-E firm by DOD with the object of effecting an
equitable distribution of DOD contracts amoung qualified A-E firms; and
(7) Project Manager's qualification and experience in the assigned
projects under this contract. Performance period will be 365 days from
contract award date, with a one year option. A-E firms desiring
consideration should submit an SF 254 and 255 and any other appropriate
data as described in Numbered Note 24 herein. Responses received by 95
Mar 20 will be considered. Multiple contracts may be awarded from this
advertisement. This is not a request for proposal. See Numbered
Note(s): 24. (0031) Loren Data Corp. http://www.ld.com (SYN# 0034 19950201\C-0008.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|