COMMERCE BUSINESS DAILY ISSUE OF JANUARY 31,1995 PSA#1273USPFO for Washington, ATTN: Contracting Office, Bldg 32, Camp Murray,
Tacoma, WA 98430-5170 Y -- FIRE SUPPRESSION SYSTEM, HANGARS 1029 & 1033, FAIRCHILD AFB
WASHINGTON AIR NATIONAL GUARD STATION, SPOKANE, WA SOL DAHA45-95-B-0002
DUE 033095 POC Joanie Dobesh, Contracting Office, 206/512-8311; LtCol
Daniel J. Hirst, Project Officer, 509/247-7352 Furnish all plant,
labor, equipment, materials, tools and other items required to provide
a Fire Suppression System, Hangars 1029 & 1033. Features include
construction of: water supply mains; a pumphouse complete with fire
pumps, piping, and associated equipment; two 4' x 9' hangar main
electrical building expansions; two preaction valve foam storage
buildings; sprinkler and under-wing fire control systems in two
aircraft hangars; a drain system to remove water and foam applied
during fire flow conditions; a storage pond to store spent fire
fighting water removed by the drain system, an oil-water separator, and
a pumping facility and pipeline to pump the water to the existing base
sanitary sewer system; and provide electrical supply, controls and
alarm system for the above. ECC is between $1 million and $5 million.
Time of completion is 240 calendar days from the receipt of Notice to
Proceed. Solicitations will be available on or about 1 March 1995 on a
first come, first serve basis by written or faxed requests. FAX
number, 206-512-8933. The proposed contract is a 100 percent set-aside
for small disadvantaged business concerns (SDB). If you are a Small
Disadvantaged Business or are a subcontractor and have already sent a
request to this office, you do not need to respond again. See Note 4.
(0027) Loren Data Corp. http://www.ld.com (SYN# 0095 19950130\Y-0002.SOL)
Y - Construction of Structures and Facilities Index Page
|
|