COMMERCE BUSINESS DAILY ISSUE OF JANUARY 30,1995 PSA#1272Jiro Inose, Director-General, Construction Department, Teito Rapid
Transit Authority, 3-19-6 Higashi-Ueno, Taito-Ku, Tokyo 110 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/25/95 PG. 3. DUE 153095
POC Tel 81/3/3837-7110 S1629 Construction of urban Transit tunnel
opening time and date 15:30, mar. 14, 1995. Open 1) Construction Title
first-phase Public works at hatogaya site on saitama Rapid Transit
line; 2) site 5- 1-chisaki minami to 1003-chisaki tsuji, hatogaya-Shi,
saitama-ken; 3) summary Construction of an urban Transit tunnel of 9
50 meters outer diameter and 1,423 766 meters length by the
slurry-pressure shield tunneling method; 4) Construction period 51
months; 5) main Materials to be used estimated volume of Construction
1,416 meters of lining plates; 6) deadline for submission of
application forms/related documents for qualification screening feb. 6,
1995; 7) contact for tender no: administration Division,
constructiondepartment, telto Rapid Transit Authority, 3-19-6
Higashi-Ueno, Taito-Ku, Tokyo 110 qualifications for tender
participants consortia comprised of two or three firms that meet the
following criteria and that have been pre-qualified for bidding on this
project by the Director of the Construction Department 1) firms that
are solvent; 2) firms that have been rehabilitated from bankruptcy; 3)
firms qualified for Construction works under article 3 of the
Construction business law; 4) firms that are sound in their business
operations; 5) firms that have not perpetrated any of the following
Acts in the past two years from the deadline for qualification
screening a) intentionally carried out poor work or unfairly cheated on
quality/quantity of Materials in a contract; B) interfered with fair
competition, fair pricing or colluded for unfair benefit; C) interfered
with a winner's signing of a contract or interfered with a contractor
from carrying out assigned duties; D) interfered with official staff's
supervising or inspecting a contract; e) unjustifiably reneged on
carrying out a contract; and F) had extremely poor records in a
contract; 6) firms not employing as representative, Manager, or staff
anyone who has misbehaved per (a) to (F) within two years of their
misconduct; 7) firms grade '' a''-qualified for Public works by this
Authority for fy 93/94; 8) firms that have -- since 1985 as the main
contractor -- actually carried out Construction of an urban Transit
tunnel of at least 6 0 meters outer diameter, including one under
Construction at this time, by the closed-type, slurry-, earth-, or
slurry/earth-pressure shield tunneling method for this Authority, a
pubic subway, a third-sector Transit, Japan railway Construction Public
corporation, and Japan railway companies note: only Construction
projects in which the bidder has had a 20 percent or greater share are
eligible for review; 9) firms that can assign to the Construction site
a full-time chief engineer or engineering supervisor who meets the
following criteria a) is qualified as a certified first-class
Construction supervisor or a Construction engineer under the engineers
law; B) has since 1985 had similar Construction experience as
described in item (8) above, and similar experience refers to
Construction of an urban Transit tunnel by the closed-type shield
tunneling method; and C) in the case of engineering supervisor, is
qualified to supervise designated Construction works; 10) firms not
currently suspended prom designation by this Authority; 11)
requirements for a designated consortium a) comprised of two or three
firms that meet (1) to (7) above, and the same firm cannot belong to
more than one consortium; B) all member firms must have Construction
experience as described in (8) above; C) all member firms must employ
a chief engineer or engineering supervisor as specified in (9)-(a) to
(C) above, and can assign him or her to the Construction site on a
full-time basis; D) all member firms must have an involvement ratio of
at least 30 perce nt for two-firm consortium and of at least 20
percent for three-firm consortium; e) the representative firm of a
consortium must have Construction experience as consortium's
representative, and must have the greatest share of involvement among
all members; F) a consortium is valid from the date of its designation
to the date of completion of this project, and for firms other than
the bid winner, to the date of contract signing for this project; and
G) the Title of a consortium ''aa-bb Construction consortium'' for
two-firm consortium, and ''aa-bb-cc Construction consortium'' for
three-firm consortium bid documents must be obtained directly from the
submitting agency, not from U S. Embassy. Date of publication in
''kensetsu kogyo shimbun'' 012595. Post contact/prepared by gtaevs
Please send a copy of your response to: Commercial Section (FCS TOP),
American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0283..
(0026) Loren Data Corp. http://www.ld.com (SYN# 0304 19950127\99-0001.SOL)
99 - Miscellaneous Index Page
|
|