COMMERCE BUSINESS DAILY ISSUE OF JANUARY 25,1995 PSA#1269NASA Langley Research Center, MS 144, Industry Assistance Office
Hampton, Va. 23681-0001 Z -- S/M TO REPLACE CHILLERS AT THE SCIENTIFIC COMPUTING FACILITY SOL
1-073-GGK.11015 DUE 031595 POC Bid Distribution Office,(804)864-2547.
The work to be performed under consists of replacing chillers at the
Central Scientific Computing Facility, Building 1268A. The Contractor
shall furnish all plant, equipment, tools, materials, labor and
services necessary for or incidental to a complete and finished job as
shown on the drawings listed below and as specified herein. The work
to be performed includes, but is not limited to, the following:
Removing existing chillers numbers 1 and 2 and installing two new
centrifugal chillers. Providing all piping, valves, controls and
electrical components associated with the installation of the new
chillers. Contract duration 300 days--Estimated cost range between
$250,000 and $500,000--All responsible sources may submit a bid which
will be considered by the Agency--March 15, 1995--Bid opening is
approximate-- Solicitation available approximately 2/2/95. (0023) Loren Data Corp. http://www.ld.com (SYN# 0167 19950124\Z-0026.SOL)
Z - Maintenance, Repair or Alteration of Real Property Index Page
|
|