|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 13,1995 PSA#1262Atsuro Ohara, Director-General, Administration, Division, Ehime
University, 10-13 Dogo-Himata, Matsuyama-Shi 790-77 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/09/95 PG. 4. DUE 140095
POC Tel 81/899/24-7111 X2163 S16 construction of school building
opening time and date 14:00, feb. 28, 1995. Open 1) construction Title
construction of school building for the faculty of engineering, Ehime
University; 2) site on the campus of Ehime University, 3-ban bunkyo-
cho, Matsuyama-Shi; 3) summary a) use of building: educational
structure for the conducting of experiments and research by the faculty
of engineering; B) structure and number of stories steel-framed
reinforced concrete construction, eight 8TORIES above ground; and C)
size of building land area 727 square meters, total floor area 5,052
square meters, site area 121,021 square meters; 4) construction period
approx. 13 months (390 days); 5) main materials to be used approx.
4,800 cubic meters of concrete, approx 390 tons of steel frame, approx.
490 tons of reinforcing steel; 6) deadline for submission of
application forms/related documents for qualification screening 17:00,
jan. 20, 1995; 7) Contact for tender documents General Affairs
Section, planning Division, facilities department, Ehime University,
10-13 Dogo- Himata, Matsuyama-Shi 790-77 12 eligible tender
participants: 1) firms that do not fall under articles 70 and 71 of the
cabinet order concerning budget, auditing, and accounting; 2) firms
grade-''a'' qualified for open competitive tendering on construction
works by the ministry of education, science, and culture for goj fy
93/94; 3) firms that score 1, 100 points Or more in a ''P'' value
obtained from an evaluation of bidding company's management operations
at the time of application for qualification; 4) firms that have since
1988 actually carried out construction of a school building Or research
facility, made of steel-framed reinforced concrete, six-stories Or more
and at least 4,000 square meters total floor area note: only
construction projects in which bidder has had a 30 percent Or greater
share are eligible for consideration; 5) firms that can assign to the
construction site a full- time chief engineer Or engineering supervisor
who meets the following criteria a) is qualified as a certified
first-class construction supervisor Or architect; B) has had since 1988
construction experience as described in item (4) above; and (C) in the
case of engineering supervisor, is qualified to supervise designated
construction works; 6) firms not currently suspended from designation
by the official in charge of outlays; and 7) firms not related by
capital Or personnel to the contractors involved in this project bid
documents must be obtained directly from the submitting agency, not
from U S. Embassy. Date of publication in ''kensetsu kogyo shimbun''
010995. Please send a copy of your response to: Commercial Section (FCS
TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to
TC0245.. (0011) Loren Data Corp. http://www.ld.com (SYN# 0325 19950112\99-0003.SOL)
99 - Miscellaneous Index Page
|
|