COMMERCE BUSINESS DAILY ISSUE OF JANUARY 11,1995 PSA#1260Kotaro Hashimoto, Director-General, Kinki Regional Construction Bureau
(Moc), 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/06/95 PG. 2. DUE 140095
POC Tel 81/6/942-1141 S1629 Construction of floodgate Opening time and
date 14:00, mar. 24, 1995. Open 1) Construction Title Construction of
new floodgate for kinokawa river large weir; 2) site left Bank -
arimoto- chisaki; right Bank - sonobe-chisaki, wakayama-Shi; 3) summary
a) type of gate: shell-structured roller gate; B) number of Gates five
Gates; C) net span length: 51 6 meters; D) height of gate: 7.1 meters;
and e) method of gate Opening/closing wire-rope winch method (two
motors, two drums); 4) Construction period: approx. 50 months; 5) main
materials to be used approx. 3,500 tons of regular steel (ss, sm),
approx 500 tons of stainless steel; 6) deadline for submission of
application forms/related documents for qualification screening 16:30,
feb. 6, 1995; 7) contact for Tender documents contract Division,
General Affairs Department, Kinki Regional Construction Bureau,
ministry of Construction, 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540
eligible Tender participants 1) designated consortia pre-qualified by
the Kinki Regional Construction Bureau and comprised of firms that meet
the following criteria a) firms that do not fall under articles 70 and
71 of the cabinet order concerning budget, auditing, and accounting;
B) firms qualified for open competitive tendering on machinery
installation by the Kinki Regional Construction Bureau; C) firms not
undergoing bankruptcy procedures; D) firms that have -- since 1974 as
the main contractor -- actually carried out manufacture and
installation of a shell-structured roller gate of 25 meters or more
span length note: only Construction projects in which bidder has had a
30 percent or greater share are eligible for consideration; e) firms
not currently suspended from designation by the Director of the Kinki
Regional Construction Bureau; and F) firms not related by capital or
personnel to the contractors involved in this project; 2) designated
consortia that meet the following criteria a) the representative firm
of a consortium must have -- since 1974 as the main contractor --
carried out manufacture and installation of a shell-structured roller
gate of 35 meters or more span length, independently or as a consortium
note: only Construction projects in which bidder has had a 30 percent
or greater share are eligible for consideration; B) designated
consortia that can assign to the Construction site a full-time Chief
engineer or engineering supervisor who meets the following criteria (1)
is qualified as a certified first-class Construction supervisor or
equivalent or higher; (2) has had experience of installing a shell-
structured roller gate for a weir or floodgate; and (3) in the case of
engineering supervisor, is qualified to supervise designated
Construction works; and 3) the following plans of action should be
adequate a) at the time of Construction of the whole system, concrete
steps, safety measures, and reminders about under-bridge passage in
transit on the sea and in the river and about the installation method
must be presented; and B) the system and method of securing a level of
6 millimeters or less in gate surface accuracy must be described bid
documents must be obtained directly from the submitting agency, not
from U S. Embassy. Date of publication in ''kensetsu kogyo shimbun'':
010695. Post contact/prepared by gtaevs P 96337 Refer to TC0241 Please
send a copy of your response to: Commercial Section (FCS TOP),
American Embassy, Tokyo, Unit 45004, APO A.. (0009) Loren Data Corp. http://www.ld.com (SYN# 0438 19950110\99-0001.SOL)