COMMERCE BUSINESS DAILY ISSUE OF JANUARY 10,1995 PSA#1259NASA, Johnson Space Center, BJ3, Houston, TX Y -- REHABILITATION OF UTILITY TUNNEL STRUCTURE AND SYSTEM SOL
9BJT07-5-4B POC Request solicitation from BD35 /Bid Board, phone
713-483-4511. Contact:BETTY HOLT, Tel:713-483-4175 Contracting Officer:
LUDOLPH INGWERSEN, Tel:713-483-4177 This project includes a base bid
and 2 additive alternates. The base bid involves upgrading the tunnel
fire alarm system; providing a new communications system; replacing the
electrical receptacles; upgrading the tunnel ventilation system;
upgrading and sealing the tunnel hatches; construction new structural
crossovers, exhaust vents, an/ exitways. New underground runds of steam
and condensate lines, as well as replacement of steam and condensate
lines within the tunnel and associated asbestos insulation abatement
will also be included in the project. Additive Alternate No.1 will be
the repair of several concrete cracks and expansion joints in the
tunnel floor, wall and ceiling. Additive alternate no. 2 will be the
construction of a single structural concrete cross. The construction
cost is estimated to be in the $1,000,000 to $5,000,000 range. Period
of construction is 550 calendar days. SIC code 1542. Open to large and
small businesses. (0006) Loren Data Corp. http://www.ld.com (SYN# 0082 19950109\Y-0007.SOL)
Y - Construction of Structures and Facilities Index Page
|
|