Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF SEPTEMBER 10, 2026 SAM #9054
SOLICITATION NOTICE

43 -- New Turbo Molecular High Vacuum Pump for Vacuum Facility 6

Notice Date
9/8/2026 12:00:00 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
333912 — Air and Gas Compressor Manufacturing
 
Contracting Office
NASA SHARED SERVICES CENTER STENNIS SPACE CENTER MS 39529 USA
 
ZIP Code
39529
 
Solicitation Number
80NSSC26942555Q
 
Response Due
9/9/2026 10:00:00 AM
 
Archive Date
09/24/2026
 
Point of Contact
Sara Jusino-Terry
 
E-Mail Address
sara.a.jusino-terry@nasa.gov
(sara.a.jusino-terry@nasa.gov)
 
Description
Q&A 1. What is the required quantity? One 2. Please confirm the exact delivery address and required delivery date or lead-time requirement. The RFQ states FOB Destination but does not identify the destination address or schedule. 21000 Brookpark Rd Building 301 Dock Cleveland, OH 44135 3. Is the requirement limited to supply and delivery, or are installation, integration, testing, commissioning, removal, training, or on-site technical support required? Supply & delivery only 4. Please confirm whether either listed brand-name model is acceptable when configured exactly to the stated specifications: Ebara EMT2400-MBWB or Osaka TG2400-MBWB. Yes 5. Please provide any required technical data sheets, country-of-origin information, warranty terms, packing/shipping instructions, and acceptance criteria not included in the RFQ. Standard factory warranty terms shall be honored. Packing shall be of sufficient quality to protect from damage during transit. 6. Please confirm whether any bonding, insurance, licensing, cybersecurity, facility-access, export-control, or site-visit requirements apply to this purchase. No 7. Please confirm whether manufacturer pricing proof and reseller authorization may be provided as manufacturer/distributor letters attached to the quotation. I am not familiar with this question. 8. Please confirm whether the Government has identified a specific controller, connector, cable, inlet screen, air-cooling kit, or water-cooling configuration beyond the specifications in Section 1. Turbopump with air and water cooling kit, inlet screen and cable only. No controller is needed. If needed, the controller can be removed from the SOW.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/ad2336b3e47b42289aeeee7fb5820e0c/view)
 
Record
SN07961199-F 20260910/260908230049 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.