Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF SEPTEMBER 04, 2026 SAM #9048
SOLICITATION NOTICE

P -- Mobile Home Demolition

Notice Date
9/2/2026 12:00:00 AM
 
Notice Type
Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
W7M2 USPFO ACTIVITY FL ARNG ST AUGUSTINE FL 32085-1008 USA
 
ZIP Code
32085-1008
 
Solicitation Number
W911YN-26-Q-A024
 
Response Due
9/11/2026 2:00:00 PM
 
Archive Date
09/26/2026
 
Point of Contact
Robert Glanowski, Darrin Weaver
 
E-Mail Address
robert.j.glanowski.civ@army.mil, darrin.j.weaver.mil@army.mil
(robert.j.glanowski.civ@army.mil, darrin.j.weaver.mil@army.mil)
 
Small Business Set-Aside
SBA Small Business Set Aside - Total
 
Description
PERFORMANCE WORK STATEMENT Mobile Office Demolition 1.0 Objective The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals. 2.0 Scope of Work This project will be executed in three (3) distinct phases: Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel. Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility. Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition. 3.0 Completion Standard The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear. 4.0 Details Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB) Site POC: CW2 Merrill, Andrew (904) 682-6215 ext. 1150 andrew.d.merrill2.mil@army.mil Site Visit Date: 09 September 2026 Time: 10:00 AM Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221 POC: Andrew Merrill (CW2) andrew.d.merrill2.mil@army.mil (904) 682-6215 ext. 1150 Robert Glanowski (Contract Specialist) robert.j.glanowski.civ@army.mil (904) 823-0555 ***Attendance is not required and will not prohibit quote submissions.***
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/da0ab67a2647465e9fd8d2d5b345df58/view)
 
Place of Performance
Address: Jacksonville, FL 32221, USA
Zip Code: 32221
Country: USA
 
Record
SN07954601-F 20260904/260902230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.