MODIFICATION
36 -- AdvM Call for Solutions - Expeditionary Additive Manufacturing (EAM) Systems
- Notice Date
- 8/24/2026 12:00:00 AM
- Notice Type
- Solicitation
- NAICS
- 333248
—
- Contracting Office
- W6QK ACC-RSA REDSTONE ARSENAL AL 35898-5200 USA
- ZIP Code
- 35898-5200
- Solicitation Number
- PANRSA-26-P-0000040885
- Response Due
- 8/31/2026 10:00:00 AM
- Archive Date
- 09/15/2026
- Point of Contact
- Melissa Jakes, Morgan McGee
- E-Mail Address
-
usarmy.redstone.acc.mbx.acc-rsa-advm-cso@army.mil, usarmy.redstone.acc.mbx.acc-rsa-advm-cso@army.mil
(usarmy.redstone.acc.mbx.acc-rsa-advm-cso@army.mil, usarmy.redstone.acc.mbx.acc-rsa-advm-cso@army.mil)
- Description
- The U.S. Army Aviation and Missile Command (AMCOM) is seeking innovative solutions consisting of three (3) Expeditionary Additive Manufacturing (EAM) Systems for immediate integration at Fort Campbell, Fort Hood, and Fort Bragg. These systems will provide an expeditionary, point-of-need manufacturing capability designed to immediately translate digital technical data packages (TDPs) into structural, environmentally-grade components within tactical maintenance environments. Establishing expeditionary, point-of-need manufacturing capability at these installations is vital for empowering forward-deployed liaison engineers to manufacture immediate, structurally adequate replacement parts, fixtures, and specialized maintenance tooling on-site. Proactively deploying this capability is essential for overcoming extended supply chain lead times for low-demand, non-flight-safety-essential components, mitigating critical aviation readiness degradation, and significantly reducing prolonged aircraft-on-ground (AOG) status for simple component failures. The full Call for Solutions document(.pdf), detailing the problem statement, required solution attributes, submission requirements, and evaluation phases, is available in the ""Attachments"" section below. All questions regarding this Call must be submitted via email to Melissa Jakes at melissa.d.jakes.civ@army.mil and Morgan McGee at morgan.p.mcgee2.civ@army.mil. The deadline to submit questions for Phase 1 is Wednesday, 26 August 2026, at 12:00 PM Central Time. The following shall be utilized in the email subject line: "" Call for Solution � Advanced Manufacturing Expeditionary Additive Manufacturing (EAM) Systems� This Call for Solution is issued under the Army Advanced Manufacturing (AdvM) Commercial Solutions Opening (CSO) which can be found at: https://sam.gov/opp/e2f1410155dc4ba78c51fca8360875cf/review
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/69a143cc118243b48a82fb5cfea2a3b8/view)
- Record
- SN07939668-F 20260826/260824230045 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |