Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 26, 2026 SAM #9039
AWARD

P -- P-8A Poseidon Enhanced Digital Flight Control System (EDFCS) Correction of Deficiencies (COD)

Notice Date
8/24/2026 12:00:00 AM
 
Notice Type
Award Notice
 
Contracting Office
NAVAL AIR SYSTEMS COMMAND PATUXENT RIVER MD 20670-5000 USA
 
ZIP Code
20670-5000
 
Solicitation Number
N00019-21-RFPREQ-APM290-1479
 
Archive Date
08/25/2026
 
Point of Contact
Ronald A Hickman, Sarah M Kalinoski
 
E-Mail Address
ronald.a.hickman.civ@us.navy.mil, sarah.m.kalinoski.civ@us.navy.mil
(ronald.a.hickman.civ@us.navy.mil, sarah.m.kalinoski.civ@us.navy.mil)
 
Award Number
N0001926G1002
 
Award Date
07/31/2026
 
Awardee
THE BOEING COMPANY Tukwila WA 98108 USA
 
Award Amount
11381401.59
 
Description
The Naval Air Systems Command (NAVAIR) awarded a cost-plus-fixed-fee (CPFF) delivery order for the development, testing and delivery of aircraft loadable, black label enhanced digital flight control system software for operational level retrofit for delivered aircraft to correct deficiencies in the P-8A autopilot system that were noted in software design description developmental and operational testing. The software updates will improve or resolve altitude acquire issues, autopilot placard speed exceedance resulting from out throttle retard deficiency, pitch oscillations during airspeed climb and descent, unexpected mode switch from altitude acquire to vertical speed following speed command change, slow auto throttle response, and bank limit margin tuning. Award to a source other than Boeing would result in an unacceptable delay of 3-5 years due to the Government�s inability to provide technical data to another source to develop and integrate the corrections to the software deficiencies to the EDFCS software. Additionally, the timeline delay is unacceptable due to the inherent safety risks that the P-8A is presently operating under. The current EDFCS design does not adequately ensure the P-8A can capture an altitude hold command when the autopilot system is engaged. The lack of altitude capture could cause the aircraft to enter an uncommanded descent resulting in a controlled flight into terrain with associated loss of aircraft and flight crew. It was determined that a CPFF contract action was the appropriate contract type pursuant to FAR 16.103(d)(1). There are significant cost uncertainties due to the developmental nature of the effort and required end product of corrected deficiencies to the EDFCS for the P-8A aircraft. Therefore, the use of a fixed-price type contract would not provide an equitable and sensible allocation of program risk between the Government and the Contractor.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/7f27b26c5da8418dad98381653b0d194/view)
 
Record
SN07939428-F 20260826/260824230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.